Yes, in most estates. No law or published licence condition of MPS, MPHS or MBSA sets factory hours in Rawang, Serendah or Shah Alam. The limit is night noise: DOE's guideline allows 75 dBA day and night in an existing industrial zone, but only 55 to 60 dBA at night at nearby homes, schools and places of worship.
Key Takeaways
- No law or council condition I have read stops a factory in Rawang, Serendah or Shah Alam from running 24 hours. The published licence conditions of MPS, MPHS and MBSA set closing times for entertainment outlets, cyber cafes and beauty or health centres, not for factories. They do require that your business causes no noise nuisance.
- Night noise is the real limit. The Department of Environment (DOE) guideline allows 75 dBA by day and by night in an industrial zone of an existing built-up area, but only 60 dBA at night at suburban and urban homes and 55 dBA at low density homes, schools, hospitals and places of worship. Night means 10pm to 7am.
- Night loading is possible, but not noisily next to homes. DOE's code of practice says loading and unloading between 10pm and 7am should not cause a noise disturbance across a residential boundary. MPHS wants loading kept off the road, and peak-hour highway bans push truck trips into the early morning and evening.
- Shifts may run longer than 8 hours, as long as nobody works more than 12 hours a day and the average over any three weeks stays at or below 45 hours a week. Overtime is capped at 104 hours a month, and Part VIII of the Employment Act, on the employment of women, was deleted from 1 January 2023.
- Check the unit at night before you sign: who lives or prays within earshot, what the approvals say, whether there have been complaints, and how loud the place is before you move in.
Can a Factory Run 24 Hours in Rawang, Serendah or Shah Alam?
In most industrial estates, yes. When a client tells me they need three shifts, I do not start by looking for a rule on operating hours, because I have not found one for factories in the licence conditions of the three councils that cover my areas. MPS (Majlis Perbandaran Selayang) licenses Rawang and Kundang, MPHS (Majlis Perbandaran Hulu Selangor) licenses Serendah, Sungai Choh, Bukit Beruntung and Batang Kali, and MBSA (Majlis Bandaraya Shah Alam) licenses Shah Alam. My business premise licence guide explains how to confirm which council bills your unit.
This is what their published conditions say about hours and nuisance:
| Council | Hours written into the conditions | What applies to a factory |
|---|---|---|
| MPS (licence conditions) | None for factories | Business only inside the premises, never on the five-foot way or the surroundings; steps to make sure the business causes no pollution, noise nuisance, bad smell or obstruction |
| MPHS (composite form and conditions) | Entertainment outlets until 1am or the approved time; cyber cafes until midnight; 24-hour restaurants close 6 hours a week for cleaning | No nuisance to the local community; industrial premises follow DOSH and DOE conditions; loading must not block traffic and is done in the back lane |
| MBSA (licence conditions) | Beauty and health centres 10am to midnight; cyber centres 7am to midnight unless the council agrees otherwise | Premises kept free of nuisance; the activity must follow the building's approved use |
So the council does not hand a factory a closing time, but a licence that says "no noise nuisance" can be used against a plant that keeps a housing area awake. Hours can also sit in other papers that belong to the unit: the planning permission, the approval of an Environmental Impact Assessment (EIA), which the DOE guideline says sets noise compliance, monitoring and mitigation for construction and operation, or a condition added to one particular licence. I ask the landlord for each of these before we talk about rent.
What Are the DOE Noise Limits at Night, by Land Use?
The DOE Guidelines for Environmental Noise Limits and Control, third edition 2019 (reprint 2021) give recommended limits as an A-weighted equivalent sound level (LAeq), set by the land use that receives the noise. Day is 7am to 10pm; night is 10pm to 7am.
| Receiving land use | Existing built-up areas (Schedule 2), day / night | New development (Schedule 1), day / night |
|---|---|---|
| Low density homes, noise sensitive receptors, schools, hospitals, places of worship | 60 / 55 dBA | 55 / 50 dBA |
| Suburban homes (medium density) | 65 / 60 dBA | 60 / 55 dBA |
| Urban homes (high density), mixed development | 65 / 60 dBA | 65 / 60 dBA |
| Commercial business zones | 70 / 65 dBA | 65 / 60 dBA |
| Industrial zones | 75 / 75 dBA | 70 / 65 dBA |
How the guideline applies them:
- Where it is measured. Outdoors at the property boundary of the receptor, usually a home or another noise sensitive place. For industrial noise in an industrial zone, the assessment point may be the boundary of the plant itself. Measurements are usually taken 1.5 m to 4 m above ground.
- Which table. Schedule 1 is for new industrial, commercial or housing areas and undeveloped land; Schedule 2 is for existing developed areas.
- Already noisy places. Where the existing level is above Schedule 2, Schedule 3 asks that it be kept at the existing LAeq, within plus or minus 1.5 dBA.
- What counts as a disturbance. Annex D defines a noise disturbance as sound that exceeds the existing ambient LAeq by 10 dB, or exceeds the limits in the guideline.
On legal weight, the guideline quotes section 23 of the Environmental Quality Act 1974: no person shall, unless licensed, emit noise greater than the acceptable conditions specified under section 21. It adds that compliance with its limits may be made mandatory through the instruments available to DOE and local authorities. In practice I treat the schedules as the numbers an officer will measure against if a neighbour complains.
What it means for a night shift: in an existing estate the industrial-zone figure stays at 75 dBA through the night, while the figure at the nearest suburban home drops from 65 to 60 dBA, and at a low density home, school or place of worship from 60 to 55 dBA. The level your plant must meet at a home boundary at night is 15 to 20 dB lower than the industrial-zone figure.
Where in My Areas Can a Factory Realistically Run Through the Night?
The answer is lot by lot, not town by town. Rawang, Serendah, Bukit Beruntung, Kundang and Shah Alam all have factories that sit among other factories, and edge lots where the next boundary is a housing area, a school or a place of worship. These are the things I look at:
- What is across each boundary. I check the zoning of every neighbouring lot and then walk the perimeter. A lot that only touches other industrial lots is judged on industrial-zone figures; a lot that backs onto homes is in practice judged at the homes.
- Which class your process falls in. Heavier processes need wider buffers from homes, and the councils look at that when they approve the use. My light, medium and heavy industry guide and Ms Teh's light, medium and heavy industry page explain the classes.
- Where the noise comes out. Compressors, chillers, cooling towers, generator sets, dust collectors and exhaust fans outside the building matter more at night than machines inside it. DOE's Annex D says outdoor equipment, exhausts, discharge vents and ventilation openings that make excessive noise should be fitted with sound attenuators, enclosures or barriers.
- How loud the place already is at night. I go back between 10pm and midnight. Next to a busy road the existing level may already be high, and the 10 dB disturbance test in Annex D is counted from that existing level.
To narrow the search, I start from the area pages for Rawang, Serendah and Shah Alam and the Bukit Beruntung industrial area page, then look at single lots. FactoryHub's industrial park pages are useful for the layout of each estate, and its registered transactions page shows registered prices in the estates you shortlist.
Can Loading and Unloading Go On 24 Hours?
Yes, inside your own compound and quietly enough. Four sets of rules meet at the loading bay:
- DOE's code of practice. Annex D, item 10 says a person licensed by the local authority should not load, unload or handle goods, cargo, boxes, crates or containers between 10pm and 7am the following day, or in a manner that causes a noise disturbance across a residential property boundary or within a noise sensitive zone. I read it as aimed at loading that disturbs homes: a dock in the middle of an estate is in a very different position from one that faces a housing area.
- Council conditions. MPHS's added conditions for industrial and workshop premises say loading must not obstruct traffic and is to be done in the back lane, and MPS confines the business to the premises. Trucks queuing on the estate road at 2am are a licence problem as well as a noise one.
- Highway peak-hour bans. From 19 February 2025, Lembaga Lebuhraya Malaysia (LLM) bars Class 2 vehicles (two axles, six wheels) and Class 3 vehicles (three axles or more), except buses, from selected Klang Valley stretches on weekdays other than public holidays, from 6.30am to 9.30am and 4.30pm to 7.30pm. The stretches are the North-South Expressway between Sungai Buloh and Bukit Lanjan, NKVE between Shah Alam and Jalan Duta, ELITE between Shah Alam and Bandar Saujana Putra, and the whole of DUKE (LLM announcement; Bernama via Astro Awani). Trucks from Rawang, Kundang or Serendah heading south through Sungai Buloh, or from Shah Alam onto NKVE or ELITE, have to plan around those windows, which moves trips into the 10pm to 7am period.
- Festive road bans. JPJ's ban for Chinese New Year 2026, on 14 to 15 and 21 to 22 February, kept the heavier lorries off the road for all four days and restricted container and cargo lorries from 8pm to 8am, with exceptions for trips between ports or airports and industrial areas in the same state (FMT). For Hari Raya Aidilfitri 2026 the ban ran on 19 to 20 and 28 to 29 March, with container and cargo lorries allowed from 8am to 8pm (The Star). A plant that ships at night needs a plan for those days.
On a site visit I check which way the dock faces, how far a 40-foot container has to reverse and whether it can wait inside the gate. My 40-footer access guide covers the yard checks.
What Does the Employment Act Allow for Night Shifts and 12-Hour Shifts?
The Employment Act 1955 defines shift work as work that by its nature has to be carried on continuously or continually by two or more shifts. For those employees:
- Hours. Section 60C lets an employer require more than 8 hours a day or 45 hours a week, as long as the average over any three weeks does not exceed 45 hours a week; the Director General of Labour can approve a longer averaging period. Nobody on shift may be required to work more than 12 hours a day, except in cases such as an accident, work essential to the community, urgent work on machinery or an interruption that could not be foreseen.
- Breaks. The rule against more than five consecutive hours without at least 30 minutes of leisure still applies.
- Rest day. For a shift worker, any continuous period of at least 30 hours counts as the rest day (section 59).
- Overtime. Paid at no less than 1.5 times the hourly rate (section 60A) and capped at 104 hours a month by the Employment (Limitation of Overtime Work) Regulations 1980, unless the Director General permits more.
- Women. Part VIII, on the employment of women (sections 34 to 36), was deleted by the Employment (Amendment) Act 2022 from 1 January 2023, so the Act no longer has separate night work rules for women.
- Allowance. The Act lets the Minister make regulations on shift allowances and on working at night, but it does not fix an amount itself, so put the allowance in the contract. Employees earning more than RM4,000 a month fall outside the overtime, rest day, holiday and shift allowance provisions, but manual workers, drivers and supervisors of manual workers stay covered whatever they earn (First Schedule).
Check the roster over every three-week window, not only the yearly average: a 12-hour pattern can pass in one window and fail the next. Night shift workers also need a way to and from work; my hiring and worker hostel guide covers hostel rules and train times in these areas.
Inside the building, the noise rules of the Department of Occupational Safety and Health (DOSH) apply around the clock. DOSH defines excessive noise as a daily exposure above 82 dB(A), a daily dose above 50 percent, a maximum above 115 dB(A) or a peak above 140 dB(C). Its code of practice normalises exposure to an 8-hour day, so a worker beside the same machine for a 12-hour shift has a daily exposure about 1.8 dB higher than on an 8-hour shift.
How Do I Check a Factory for 24-Hour Use Before Signing?
This is the order I work in when a client needs round-the-clock operation:
- Write down the night pattern. Shifts, the number of truck movements after 10pm, and every noisy item that sits outside or vents outside.
- Collect the papers. Planning permission, approved building plans, CCC or CF, any DOE or EIA approval, and the previous tenant's licence. I read each for conditions on hours, noise or loading.
- Map the neighbours. Homes, schools, hospitals and places of worship within earshot, and the zoning of each neighbouring lot.
- Visit at night. Between 10pm and midnight, and again around 6am, to hear the existing noise and see where trucks wait.
- Ask about complaints. Has the council or DOE ever written to the owner or the previous tenant about noise?
- Measure before you move in. The DOE guideline lists a baseline measurement before a plant starts as part of an assessment, and its record keeping section says what to keep: levels, instruments, microphone positions, site plans and weather. A consultant's baseline gives you something to compare with if a complaint comes later.
- Put it in the tenancy. I ask for the landlord's written confirmation that they know of no restriction on operating hours, consent for acoustic enclosures or barriers, and agreement on where the dock and outdoor plant may go.
A 24-hour logistics warehouse near Port Klang? Port Klang is under MBDK, not the councils above. Ms Teh Seok Hoon (PEA 4006), the CID Realtors colleague who handles Klang, found no Klang rule that sets closing hours and explains what does limit round-the-clock work there (MBDK licence conditions, DOE night noise, truck parking, shifts): can a Klang factory run 24 hours.
To shortlist factories in Rawang, Serendah, Bukit Beruntung, Kundang or Shah Alam that suit night work, WhatsApp Jason Low (Probationary Estate Agent PEA 1478, CID Realtors Sdn Bhd E(1) 1855) on +60 12-288 1834.
Questions people ask
01Where can a factory run 24 hours in Rawang, Serendah or Shah Alam?+
Anywhere the approvals allow the use and the night noise at the nearest homes stays within DOE's limits. In practice that favours lots surrounded by other industrial lots, where an existing industrial zone is 75 dBA at night, over edge lots facing housing, where homes are protected at 55 to 60 dBA at night. Check the neighbours and the approvals of the exact lot before you sign.
02Can loading go on 24 hours?+
Yes, inside your own compound, as long as loading between 10pm and 7am does not cause a noise disturbance across a residential boundary, which is what DOE's code of practice asks. MPHS also requires that loading does not block traffic and is done in the back lane. Plan truck trips around LLM's weekday peak-hour bans and JPJ's festive road bans.
03What are the noise limits for factories in Malaysia?+
DOE's 2019 guideline sets limits by the land use that receives the noise. In existing built-up areas an industrial zone is 75 dBA by day and night, suburban and urban homes 65 dBA by day and 60 dBA at night, and low density homes, schools, hospitals and places of worship 60 and 55 dBA. Inside the factory, DOSH treats a daily exposure above 82 dB(A) as excessive noise.
04Does the council licence say what hours my factory may operate?+
Not in the published conditions of MPS, MPHS or MBSA, which set hours only for activities such as entertainment outlets, cyber cafes and beauty or health centres. They do require that the business causes no noise nuisance. Hours can still appear in the planning permission, an EIA approval or a condition on your own licence, so read those before you sign.
05Can women work night shifts in a Malaysian factory?+
Yes. Part VIII of the Employment Act 1955, on the employment of women, was deleted by the Employment (Amendment) Act 2022 from 1 January 2023, so the Act no longer has separate night work rules for women. The general shift rules on hours, rest days and overtime apply to everyone.
06How long can a factory shift be under the Employment Act?+
Up to 12 hours a day for a shift worker, except in cases such as accidents or urgent work on machinery. The average over any three weeks must not exceed 45 hours a week, and overtime is capped at 104 hours a month. A continuous break of at least 30 hours counts as a shift worker's rest day.
Sources
- Department of Environment: Guidelines for Environmental Noise Limits and Control, third edition 2019 (reprint 2021): sections 3 to 10, Schedules 1 to 3 and Annex D
- Employment Act 1955 (Act 265), reprint incorporating the Employment (Amendment) Act 2022: sections 2, 59, 60A and 60C, Part VIII and the First Schedule
- JTKSM: Employment (Limitation of Overtime Work) Regulations 1980 (104 hours a month)
- DOSH: Noise control guidance, definition of excessive noise under the OSH (Noise Exposure) Regulations 2019
- DOSH: Industry Code of Practice for Management of Occupational Noise Exposure and Hearing Conservation 2019
- Majlis Perbandaran Selayang: licence application, approval and licence conditions
- Majlis Perbandaran Hulu Selangor: composite licence form with general and added conditions (industrial, entertainment, cyber cafe, food premises)
- Majlis Bandaraya Shah Alam: composite licence conditions
- Lembaga Lebuhraya Malaysia: extension of the peak-hour heavy vehicle ban from 19 February 2025 (announcement, 4 February 2025)
- Bernama via Astro Awani: heavy vehicles barred from selected highways at peak hours from 19 February 2025 (stretches, classes and times)
- FMT: 4-day ban on heavy vehicles during the Chinese New Year 2026 period
- The Star: goods and logistics vehicles banned from roads during Hari Raya 2026
- FactoryHub: industrial park pages
- FactoryHub: JPPH-registered industrial transactions
Units on the market nearby
Semi-D Factory for Rent in Saujana Teknologi Rawang, Rawang, 6,525 sq ft
RM 10,500/month
Semi-Detached Factory for Sale or Rent in Saujana Rawang, Rawang, 8,000 sq ft
RM 4,000,000 · RM 15,000/month
Detached Factory for Rent in Batu 17 Rawang, 9,000 sq ft
RM 21,000/month
More on licences, bomba and approvals
- Bonded Storage Warehouse in Shah Alam: What the Building Needs Before Customs Will License It
- Can I Run a Car Workshop in a Factory Unit in Rawang, Serendah or Shah Alam? Zoning, Council Licence, Used Oil Rules and What I Check
- How to Check a Factory's Flood Risk in Shah Alam, Rawang and Serendah: Selangor Flood Map Records, Floor Level, Drains, Rivers and Insurance
- Factory for Metal Fabrication, CNC Machining and Stamping in Rawang, Serendah and Shah Alam: Zoning Class, Power, Crane, Floor Loading and DOE Checks