Factory for Metal Fabrication, CNC Machining and Stamping in Rawang, Serendah and Shah Alam: Zoning Class, Power, Crane, Floor Loading and DOE Checks
Choose the lot by process first. The DOE lists CNC machining, welding, laser cutting and structural steel as Category 3 (medium) with a 250 m buffer from homes; stamping and forging (350 m) and foundries (500 m) are Category 2 (heavy). Check TNB supply, slab and crane beams on the approved plans, and noise at the nearest house.
Who can help me find a factory in Rawang, Serendah or Shah Alam for CNC, stamping or foundry work?
Message Jason Low (PEA 1478) of CID Realtors, via klangindustrial.my or 012-288 1834, with the actual process, whether CNC, stamping or casting, plus machine list and weights, press or crane details, actual power load, floor size, lorry access, budget and timing. He can shortlist currently advertised units for that specific process, check actual availability and arrange viewings; zoning, slab and power supply are for the authorities and engineers.
Key Takeaways
- The process sets the class, not the building. The Department of Environment (DOE) siting guideline puts turning, milling, boring, grinding, welding and laser cutting of metal on the same line as plating and heat treatment: Category 3, medium industry, with a 250 m overall and 200 m primary buffer from homes (DOE guideline, Appendix B).
- Stamping and casting are heavy industry on paper. Forging, pressing, stamping and roll-forming are Category 2 at 350 m and 300 m. Casting iron, steel or non-ferrous metal, die-casting included, is Category 2 at 500 m and 350 m.
- Power comes in steps. TNB feeds a maximum demand above 350 kVA and up to 1,000 kVA by direct cable from a new substation, and from 1,000 kVA at 11 kV or 22 kV. A load above 60 kW must provide land for a substation (TNB ESAH 3.1, Connection Charges Book 2025).
- The slab is part of the machine. Selangor's by-law 68 requires an allowance of at least 20% for impact and vibration from installed machinery, and a press maker such as Cincinnati Incorporated issues a foundation drawing for its machines, so the approved structural plans and the press drawing have to be read together.
- RM5 million sits close to the registered median for a semi-detached factory in Rawang and Kundang (RM4.3 million) and above it in Serendah (RM3.16 million), but below the Shah Alam median (RM5.92 million) and below most detached factory deals.
Is metal fabrication light, medium or heavy industry in Malaysia?
No Act lists metal shops by name. The working reference is the DOE's Guidelines for the Siting and Zoning of Industry and Residential Areas, second revised edition, October 2012. Its Appendix B gives each activity, by MSIC code, a category, an overall buffer and a primary buffer. The primary buffer must be met at all times. Where the primary buffer alone cannot reach the overall distance, a secondary buffer inside your own site can make up the rest (DOE guideline, section 5.3). These are the lines I look up when a metal client briefs me:
| What you do on site | DOE activity line | Category | Overall / primary buffer |
|---|---|---|---|
| CNC turning, milling, boring, grinding, welding, laser cutting of metal parts | Treatment and coating of metals; machining | 3, medium | 250 m / 200 m |
| Plating, anodising, heat treatment, sandblasting, enamelling or lacquering metal | Same line | 3, medium | 250 m / 200 m |
| Steel frameworks, trusses, metal doors and gates, prefabricated metal buildings | Structural metal products | 3, medium | 250 m / 200 m |
| Tanks, reservoirs, containers for compressed gas | Tanks and containers of metal | 3, medium | 250 m / 200 m |
| Bolts, nuts, screw machine products, springs, wire products | Other fabricated metal products | 3, medium | 200 m / 150 m |
| Press tools, moulds, hand tools | Cutlery, hand tools and general hardware | 3, medium | 200 m / 150 m |
| Forging, pressing, stamping, roll-forming, powder metallurgy | Forging, pressing, stamping and roll-forming | 2, heavy | 350 m / 300 m |
| Grey iron, SG iron or steel castings | Casting of iron and steel | 2, heavy | 500 m / 350 m |
| Aluminium, zinc or other non-ferrous castings, die-casting | Casting of non-ferrous metals | 2, heavy | 500 m / 350 m |
| Hot or cold rolling, cold-drawn bars, welded steel tubes | Rolling and finishing mills | 2, heavy | 350 m / 300 m |
| Steel furnaces, remelting scrap into ingots | Basic iron and steel | 2, heavy | 600 m / 500 m |
| Car parts, vehicle bodies, trailers | Motor vehicle parts; bodies and trailers | 3, medium | 250 m / 200 m |
| Making machine tools, presses, mining or construction machinery | Metal-forming machinery; mining and construction machinery | 3, medium | 300 m / 250 m |
| Packing machines, fans, air-conditioning units, weighing machines | Other general-purpose machinery | 4, light | 150 m / 100 m |
The 2012 tables are not the last word. A DOE notice dated 23 January 2026 put the Guidelines on Pollution Prevention in Industrial Siting 2025 (PPIS) into force immediately, replacing the 2017 siting handbook (DOE Notice 1/2026). When an officer gives you a distance, ask which document it comes from. How the buffer is measured and how Selangor councils apply it is in my light, medium and heavy zoning guide, and Ms Teh's light, medium and heavy industry page explains the same rules for the port side of Klang.
Can a light-industry lot or a terrace factory take metal work?
Read the table again: almost every line that cuts, welds or presses metal is Category 3 or Category 2. The light lines that involve metal are finished-product makers: general-purpose machinery such as packing machines, fans and weighing machinery, and power-driven hand tools, both with a 150 m overall buffer. The DOE sorts by what you make and how, so the answer depends on what actually happens inside the unit:
- A machine maker whose product sits on a Category 4 line, such as packing machinery, may fit a lighter lot if the zone and the approvals allow it; ask the council how it reads your actual process.
- A job shop or parts maker that cuts, welds, machines or coats metal, or a structural steel fabricator, falls on Category 3 lines, and the lot needs a zone and a distance from homes to match.
- Presses, forging or a furnace put you on Category 2 lines, which rules out most units that face a housing area.
The council licence is where this is tested. Hulu Selangor's composite licence form says that making and processing may be carried out only in premises with industrial or factory status. Among the documents for industrial applicants it lists DOE approval for activities that produce waste or harm the environment, Bomba approval and DOSH machinery certificates, and it bars a licensee from changing or adding activities without the council's permission (MPHS licence form). Selayang's council (MPS), which covers Rawang and Kundang, licenses only premises with planning approval or a development order, approved building plans and a CF or TCF, and requires the licensee to prevent noise nuisance (MPS licence conditions). Shah Alam's council (MBSA) asks for a copy of the CCC or CF with an industrial composite licence application and charges RM100 to process it (MBSA).
Developers say the same in their own words. Talking to The Edge about KLIP Plus beside the LATAR Kundang exit, the developer said that with houses still in the surrounding areas "you can't really build a very heavy-duty industrial factory", and described the park as being for SMEs, light industrial operators, logistics and warehousing.
Which areas in Rawang, Serendah, Sungai Choh and Shah Alam take metal work?
I start with where metal and automotive users already operate, then test each unit. The council is the first filter: MPS for Rawang and Kundang, MPHS for Serendah, Sungai Choh, Bukit Beruntung and Batang Kali, MBSA for Shah Alam.
| Area | What is there | What I check first for metal work |
|---|---|---|
| Sungai Choh | Perodua's 522-acre headquarters site with two vehicle plants able to build up to 320,000 vehicles a year; its group includes a maker of engines, couplings and transmission components (Perodua). The industrial area has its own special area plan, given state assent on 26 March 2014 (Selangor gazette) | The zone under the special area plan, the nearest village, the power history of the lot |
| Serendah | UMW High Value Manufacturing Park: 861 acres aimed at aerospace, automotive and advanced manufacturing, with centralised labour quarters (UMW, 2024). Newer semi-detached stock such as Serendah Technology Park publishes 10 kN/m² floors and 150A supply (developer) | Plot size for a detached plant, and whether a published slab and supply fit a press line |
| Rawang and Kundang | Older estates such as Rawang Integrated Industrial Park next to newer parks planned for SMEs and logistics | Houses near the fence, the approved use on the CCC, truck access |
| Shah Alam | HICOM Industrial Estate in Seksyen 26, Seksyen 15 and Seksyen 16. Freehold land in HICOM still trades between industrial owners: in October 2026 JAG announced it is buying 15,000 sq m there from Kobe Steel for RM36.89 million (The Edge). Elmina's Masterpiece Plus detached factories publish 30 kN/m² at the production area, upgradable to 50 kN/m² at extra cost, and 400A (Sime Darby Property) | Lease years left on leasehold lots, the slab on the approved plans, the gap to the nearest housing |
For automotive suppliers, my Perodua supplier guide and UMW HVM Park guide go further. Bukit Beruntung is the most active park in the registered Serendah data, with 132 deals in 24 months. When a client will cut, weld or press, I measure the distance to the nearest house before I show any terrace unit, there or anywhere else.
How much power does a metal shop need, and what will TNB ask for?
Start from the machine list, not the meter. List every machine's rated kW or kVA, then estimate the maximum demand; my kVA to amps guide and FactoryHub's factory power calculator show the arithmetic. Then compare the result with TNB's minimum supply schemes (ESAH 3.1, Table 3-1):
| Maximum demand | Supply voltage | Minimum supply scheme |
|---|---|---|
| Above 12 kVA to 100 kVA (non-domestic) | 400 V | Three-phase service from the existing low voltage network, subject to TNB's study |
| Above 100 kVA to 350 kVA | 400 V | Underground cable from a feeder pillar or a new or existing substation |
| Above 350 kVA to 1,000 kVA | 400 V | Direct underground cable from a new substation |
| 1,000 kVA up to under 5,000 kVA | 11 kV | Fed directly through a TNB 11 kV switching station |
TNB's Connection Charges Book 2025 adds that a load above 60 kW must provide land for a distribution substation, that a medium voltage consumer pays a load charge of RM45 per kW of declared maximum demand, and that an upgrade pays the difference between the new and the existing load charge (TNB). Who pays when a landlord's unit needs more is covered in my TNB upgrade guide.
Metal shops also meet TNB's power quality limits. At the point of common coupling the handbook allows a voltage step change of 1% where loads start or switch frequently, a short-term flicker severity of 1.0 at 132 kV and below, and total harmonic distortion of 5% at 400 V. If your line has machines that start and stop all day, ask your electrical engineer to check them against these figures before you apply.
On a viewing I ask for the last twelve TNB bills, the rating of the incoming supply and main switchboard, and whether a substation already stands on the lot. For comparison, Serendah Technology Park's semi-detached units publish a 150A supply and Elmina's Masterpiece Plus detached factories publish 400A.
What floor loading does a stamping press or CNC line need?
There is no single number, because the load comes from the machine. Two documents decide it:
- The building's approved structural plans. Selangor's Uniform Building By-Laws require loads from machinery, runways and cranes to allow for dynamic effects including impact. The increase for installed machinery must be at least 20% or the MS EN 1991-1-1 figure, whichever is higher, and the design must also carry equipment while it is being installed or moved for servicing (by-law 68). Crane gantry girders are designed to the same standard under by-law 69.
- The machine maker's foundation drawing. Cincinnati Incorporated's installation notes for its 90 to 350 ton press brakes give minimum foundation sizes based on a soil bearing capacity of 2,000 lb per sq ft, recommend core drilling where the soil is in doubt, ask for 4,000 psi concrete cured for about seven days, and state that the warranty does not cover damage caused by an insufficient foundation (Cincinnati).
For comparison, Serendah Technology Park publishes 10 kN/m² (about one tonne per square metre) for its semi-detached units, and Elmina's Masterpiece Plus publishes 30 kN/m² at the production area, upgradable to 50 kN/m². Whether a press can stand on the existing slab or needs its own foundation or pit is a question for a structural engineer with both drawings in hand. In a rented unit, any new foundation or pit needs the landlord's written consent first.
My floor loading guide explains kN/m², and FactoryHub's floor loading calculator converts machine weights. For an overhead crane, my crane guide covers DOSH approval; under the 2024 regulations a crane's certificate of fitness is valid for fifteen months from the inspection (DOSH).
Noise, fumes and waste: what will the DOE and the council look at?
Noise. The DOE's Schedule 2 limits for existing built-up areas are 75 dBA day and night in industrial zones, 65 dBA by day and 60 dBA at night (10pm to 7am) at suburban and urban homes, and 60 and 55 dBA at low density homes, schools, hospitals and places of worship. For industrial noise in an industrial zone, the assessment point may be the boundary of the plant itself (DOE noise guideline 2019). The guideline names drop hammers as a source of impulsive sound and expects practical means such as low-noise equipment, acoustic enclosures and barriers. A stamping line that runs at night is the case to plan for; my 24-hour operation guide covers night limits.
Fumes and furnaces. Under the Clean Air Regulations 2014, an owner or occupier must give the DOE written notice at least 30 days before building or installing anything that may become a new source of emission, or changing a plant in a way that alters its emissions (regulation 5). Ferrous foundries with a capacity of 1 tonne or more of molten metal a day, and non-ferrous metal plants with a capacity of 2 tonnes a day (0.5 tonnes for lead or cadmium), must apply the DOE's BAT standard. An environmental impact assessment is needed for iron and steel made from scrap at 200 tonnes a day or more, or from iron ore at 100 tonnes a day or more, and for primary smelting of aluminium or copper of any size; these sit in the Second Schedule, which requires public display (EIA Order 2015).
Scheduled waste. The Scheduled Wastes Regulations 2005 list, among others, spent lubricating oil (SW 305), spent hydraulic oil (SW 306), spent mineral oil-water emulsion (SW 307), sludges containing metals such as chromium, copper, nickel or zinc (SW 204), contaminated containers (SW 409) and contaminated rags and filters (SW 410). Ask your waste contractor which codes your coolant, oils, sludge and dust fall under. A generator must notify the DOE within 30 days of producing a new category, may store waste on site for up to 180 days with no more than 20 tonnes accumulated unless the DOE approves more, and must keep an inventory (regulations). Plating or phosphating lines also bring effluent rules, covered in my factory wastewater guide.
What can RM5 million buy for a metal works factory in Selangor?
These are JPPH-registered transactions to August 2026, from FactoryHub's registered transaction pages. Sale prices per sq ft are per sq ft of land.
| Type | Rawang and Kundang | Serendah | Shah Alam |
|---|---|---|---|
| Semi-detached factory, median (typical range) | RM4.3 million (RM3.71 million to RM6.2 million), median land 12,561 sq ft | RM3.16 million (RM695,000 to RM3.8 million), median land 10,506 sq ft | RM5.92 million (RM4.62 million to RM7.14 million), median land 10,779 sq ft |
| Detached factory, median (typical range) | RM6.92 million (RM5.49 million to RM15.15 million), median land 26,215 sq ft | RM8.65 million (RM5.89 million to RM17.75 million), median land 49,744 sq ft | RM16 million (RM13.61 million to RM36.2 million), median land 67,901 sq ft |
| Industrial land, median deal | RM2.6 million, RM57 psf of land | RM2.47 million, RM37 psf of land | RM20.77 million, RM210 psf of land |
Read against a metal brief:
- In Rawang, Kundang and Serendah, RM5 million reaches the semi-detached factory band and touches the bottom of the detached range.
- In Shah Alam it falls in the lower half of semi-detached deals, and the typical detached range starts at RM13.61 million.
- Land plus your own building is the other route: the median industrial land deal is RM2.6 million in Rawang and Kundang and RM2.47 million in Serendah. Construction cost depends on the design, so get a quantity surveyor's estimate before you compare; my build or buy guide sets out the steps.
- For cash, my factory budget guide works out about RM1.3 million of your own money for a RM5 million purchase with an 80% loan.
- If the company has shareholders' funds of RM2.5 million or more, or 75 or more full-time employees, it needs a manufacturing licence under the Industrial Co-ordination Act (MIDA).
On a fixed budget I spend on what a metal line cannot change later: distance from homes, supply, slab, crane beams and truck access. Finishes come last.
What do I check on a site visit for a metal works client?
- The process list, matched to its DOE line and buffer.
- The title: the category of land use and the express conditions, from an official search.
- The zone, confirmed in writing by the council's planning department.
- The distance from the unit to the nearest house, school, place of worship or clinic.
- The CCC or CF, and whether it covers every shed, canopy and extension.
- The incoming supply, the TNB bills and any substation on the lot.
- The approved structural plans: slab load, crane beams and column grid.
- Truck access for steel deliveries: road width, gate and turning space (40-footer access guide).
- Drains, a covered scheduled waste store and a place for the compressor.
- A second visit at night if you plan shifts, to hear what the neighbours will hear.
Only units that pass the first four checks go on the shortlist I build from my listings.
Send me your machine list and process, and I will shortlist units in Rawang, Serendah, Sungai Choh or Shah Alam that fit: WhatsApp Jason Low, Probationary Estate Agent PEA 1478 with CID Realtors Sdn Bhd E(1) 1855, on +60 12-288 1834.
Questions people ask
01What industry does metal fabrication fall under in Malaysia?+
In the DOE siting guideline most metal fabrication is Category 3, medium industry: structural steel, machining, welding, laser cutting, plating and heat treatment carry a 250 m overall and 200 m primary buffer from homes. Forging, pressing and stamping, and all metal casting, are Category 2, heavy industry. Making general-purpose machinery such as packing machines or fans is Category 4, light industry.
02Is a CNC machining workshop light industry?+
Not under the DOE table. Turning, milling, boring, grinding and other machining of metal workpieces sit on the Category 3 line with a 250 m overall and 200 m primary buffer. A light-industry lot close to houses may therefore not fit, so check the zone with the council and measure to the nearest house before you sign.
03Can I run a stamping press in a semi-detached factory?+
Only if the zone, the distance to homes and the slab all allow it. Stamping is Category 2 with a 300 m primary buffer, and Selangor by-law 68 requires at least a 20% allowance for machinery impact in the floor design. Ask a structural engineer to compare the press maker's foundation drawing with the approved structural plans, and get the landlord's written consent for any pit or new foundation.
04Can I set up a foundry in Rawang, Serendah or Shah Alam?+
Casting of iron, steel and non-ferrous metals, die-casting included, is Category 2 with a 500 m overall and 350 m primary buffer, so only lots well away from housing fit. A ferrous foundry with a capacity of 1 tonne or more of molten metal a day must meet the DOE's BAT standard under the Clean Air Regulations 2014, and a new furnace needs 30 days' written notice to the DOE. Making iron or steel from scrap at 200 tonnes a day or more needs an EIA with public display.
05Do I need DOE approval for a metal fabrication factory?+
It depends on what you install and what you produce. You must notify the DOE in writing 30 days before installing a new source of emission such as a furnace or an exhaust stack, and within 30 days of generating a new category of scheduled waste. Councils may also ask for DOE approval with the licence: Hulu Selangor lists it for activities that produce waste or harm the environment.
06What can RM5 million buy for a metal works factory in Selangor?+
In JPPH-registered deals to August 2026, the median semi-detached factory cost RM4.3 million in Rawang and Kundang, RM3.16 million in Serendah and RM5.92 million in Shah Alam. Detached factories had medians of RM6.92 million and RM8.65 million in the north, with typical ranges starting at RM5.49 million and RM5.89 million. RM5 million therefore buys a semi-detached factory, or reaches the bottom of the detached range, in the north.
07What approvals are needed for factory exhaust emissions in Rawang or Serendah under MPS or MPHS?+
The main step is a written notice to the DOE, given at least 30 days before you build or install anything that could become a new source of emission, such as a furnace or an exhaust stack; this is regulation 5 of the Clean Air Regulations 2014. The council can also ask for DOE approval as part of the licence, and MPHS lists it for activities that produce waste or harm the environment. Before you install, confirm with both the DOE and MPHS what applies to your process.
Sources
- Department of Environment: Guidelines for the Siting and Zoning of Industry and Residential Areas, second revised edition, October 2012 (section 5.3; Appendix B lines for basic metals, casting, fabricated metal products, machinery and motor vehicles)
- Department of Environment: Notice to EIA Consultants No. 1/2026, PPIS 2025 replaces EESIM 2017 (23 January 2026)
- Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015: Second Schedule item 6, iron and steel and non-ferrous smelting
- Environmental Quality (Clean Air) Regulations 2014: regulation 5 (prior written notification) and First Schedule (foundries, ferrous and non-ferrous metals)
- Environmental Quality (Scheduled Wastes) Regulations 2005, with amendments to P.U.(A) 158/2007: regulations 3, 9 and 11, First Schedule codes
- Department of Environment: Guidelines for Environmental Noise Limits and Control, third edition 2019 (reprint 2021): section 4, Schedule 2 and glossary
- TNB: Electricity Supply Application Handbook 3.1 (Table 3-1 minimum supply schemes; Table 1-4 power quality requirements)
- TNB: Connection Charges Book 2025 (medium voltage load charge, upgrades, land and building for substation)
- Selangor Uniform Building By-Laws 1986, updated text including Sel.P.U. 142/2012: by-laws 68 and 69 (KPKT JKT copy)
- Cincinnati Incorporated: press brake foundation and installation notes, 90 to 350 ton
- DOSH: Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024 (certificate valid fifteen months)
- MIDA: approvals and licensing, manufacturing licence under the Industrial Co-ordination Act 1975
- Majlis Perbandaran Hulu Selangor: composite premises licence form, industrial documents and general conditions
- Majlis Perbandaran Selayang: licence application and approval conditions
- Majlis Bandaraya Shah Alam: Lesen Komposit (Perniagaan / Perindustrian), documents and processing fee
- Perodua: About Us (522-acre Sungai Choh site, plant capacity, engine and transmission components subsidiary)
- UMW Development: UMW High Value Manufacturing Park presentation (MIDA, June 2024)
- Selangor Government Gazette, 17 July 2014, No. 2913: Sungai Choh Industrial Park Special Area Plan 2020
- The Edge Malaysia: Cover Story, Supporting industrial growth in Kundang and beyond (KLIP Plus)
- The Edge Malaysia: JAG acquires industrial land in Shah Alam (Hicom Industrial Estate, from Kobe Steel), 14 October 2026
- Sime Darby Property: Masterpiece Plus detached factories, Elmina Business Park (floor loading, power)
- Serendah Technology Park: floor plan and specifications (floor loading, power)
- FactoryHub: JPPH-registered industrial transactions (Rawang and Kundang, Serendah, Shah Alam)
- FactoryHub: factory power calculator
- FactoryHub: floor loading calculator
Units on the market nearby
Semi-D Factory for Rent in Saujana Teknologi Rawang, Rawang, 6,525 sq ft
RM 10,500/month
Semi-Detached Factory for Sale or Rent in Saujana Rawang, Rawang, 8,000 sq ft
RM 4,000,000 · RM 15,000/month
Detached Factory for Rent in Batu 17 Rawang, 9,000 sq ft
RM 21,000/month
More on licences, bomba and approvals
- Can I Run a Car Workshop in a Factory Unit in Rawang, Serendah or Shah Alam? Zoning, Council Licence, Used Oil Rules and What I Check
- How to Check a Factory's Flood Risk in Shah Alam, Rawang and Serendah: Selangor Flood Map Records, Floor Level, Drains, Rivers and Insurance
- Food Factory Requirements in Rawang, Serendah and Shah Alam: Building Specs for MeSTI Certification, GMP, HACCP and Halal, and the Steps From Lease to Production
- Manufacturing Licence in Malaysia for a Factory in Rawang, Serendah or Shah Alam: Who Needs One, How to Apply to MIDA, How Long It Takes and What Changes When You Move, Expand or Sell