Does a Factory Floor Need Epoxy Coating? When It Is Required, When It Is Not, and What Floor Renovation Costs Depend On in Rawang, Serendah and Shah Alam

Written by , PEA 1478 · Published · Selling or letting your factory

Short answer

Most factory floors do not need epoxy. It is needed where the process demands a seamless, washable surface: food premises must have impervious, non-absorbent, washable floors under the Food Hygiene Regulations 2009, and chemical, pharmaceutical or clean production often specifies a resin floor. A dry warehouse or metal shop usually works on sound, sealed concrete.

Inside an open single-storey factory, half the concrete floor is coated in light grey epoxy with a floor drain and the other half is bare sealed concrete.
Illustrative image

Key Takeaways

  • Epoxy is not a general building requirement for factories. It becomes a requirement when the use demands it, most clearly for food premises, where regulation 18 of the Food Hygiene Regulations 2009 asks for floors that are impervious, non-absorbent, washable, non-toxic and adequately drained.
  • For dry storage, logistics and most metal or assembly work, a sound concrete slab with a hardened or sealed surface usually does the job; the money is better spent on cracks, joints and drainage first.
  • A coating is only as good as the slab under it. Moisture rising through the slab can make non-breathable coatings lose their bond, which is why the National Ready Mixed Concrete Association tells contractors to test slab moisture before any coating goes on (NRMCA CIP 28).
  • No official price list covers factory floor renovation. The cost depends on the area, the condition of the slab, the system chosen, how much repair comes first and whether the factory must keep running; compare written quotes on the same specification.
  • In a rented factory, a new floor finish needs the landlord's written consent and a clear answer on reinstatement at the end of the tenancy.

Does a factory floor need epoxy coating?

When a client asks me whether a unit "needs epoxy", I turn the question around and ask what will happen on the floor. Three kinds of use push towards a seamless resin floor:

  1. Food and drink. The Food Hygiene Regulations 2009 do not name a product, but regulation 18 sets the result: the floor must be impervious, non-absorbent, washable, non-toxic and drained. Bare, dusty concrete with cracks and standing water does not meet that, so most food plants end up with a resin floor or a similar seamless system, coved at the walls. My food factory requirements guide covers the rest of the building rules.
  2. Chemicals, pharmaceuticals, cosmetics and clean production. Spills, frequent washing and dust control make a sealed, cleanable floor part of the process specification. Here the customer's or the regulator's audit usually decides the system, so I ask the client for their specification before we look at units.
  3. Electronics assembly. If the client's quality programme requires a static-control floor, that requirement decides the finish, and a standard decorative epoxy may not satisfy it.

For a dry goods warehouse, a logistics hub, a furniture or metal workshop, the honest answer is usually no. Forklift traffic and pallet racking need a strong, flat slab with sound joints more than a coloured coating, and a thin coating on a weak or cracked slab wears through at the busiest aisles first.

When is epoxy not the right answer?

Epoxy is often sold as the cure for a floor that has a different problem. Before I let a client pay for a coating, I look for these:

  • Cracks and moving joints. A coating does not stop a slab from moving. If the cracks come from settlement or overloading, they come back through the new surface. My floor loading guide explains how to tell a drying shrinkage crack from a serious one and when to bring in an engineer.
  • Moisture from below. NRMCA's guidance says moisture in a slab can cause bond-related failures of non-breathable floor coatings, and that manufacturers require the slab's moisture to be below a set threshold before installation (CIP 28). It describes test methods under ASTM F710 and recommends breathable coatings or other finishes when moisture cannot be brought down. Its note on vapour retarders adds that floors built without coatings in mind, such as warehouses, are often converted later to uses that need moisture-sensitive finishes (CIP 29). An older ground-bearing slab in a low-lying estate is exactly that case.
  • Water that has nowhere to go. In a wash-down area the floor must fall to the drains. Coating a flat or back-falling slab gives you a shinier puddle.
  • Wrong system for the traffic. A thin coat suits light foot traffic and trolleys; steel-wheeled pallet trucks, dragged loads and hot water call for thicker systems. The supplier should state which traffic and chemicals their system is rated for, in writing.

How much does factory floor renovation cost?

I have not found any official or published price list for factory floor coatings or slab repair that I could quote, so I give no figure here. What I can tell a client is what moves the price, so that quotes can be compared fairly:

What drives the cost Why it matters
Area and access Large open areas cost less per sq ft than small rooms, corners and areas around fixed machines
Condition of the slab Grinding, crack injection, joint repair, patching of old trenches and levelling come before any coating and can cost as much as the coating itself
Moisture A slab that fails the moisture test needs a moisture-tolerant primer or a different system
System and thickness A thin roller coat, a self-levelling screed and a heavy mortar system are different products with different lives
Coving, drains and joints Food areas need coved skirting, sealed joints and drain details
Working around production Night or weekend work, phasing and protecting machines all add time

To get comparable quotes, I suggest the client writes one specification (area, system, thickness, traffic, chemicals, repairs included, curing time before use, warranty) and asks every contractor to price against it. A quote that leaves out surface preparation is not cheaper; it is incomplete.

What should a tenant agree with the landlord before changing the floor?

A new floor finish is a change to the landlord's building. Before any grinding starts, I make sure the client has the landlord's written consent, a description of the works, who pays, who owns the finish and whether it must be removed when the tenancy ends. Removing a bonded resin floor is not a small job, so reinstatement can become a cost at the end of the lease. My guide to renovation and reinstatement works sets out the clauses, and who pays for repairs in a rented factory covers the line between repair and improvement. Photograph the floor at handover too, as in my handover checklist.

What do I check on the floor during a site visit?

  • Cracks, their width and whether they line up with joints, columns or racking legs.
  • Joint edges that are broken or rocking under a pallet truck.
  • Dark damp patches, white powder or lifting paint near the walls, which can point to moisture.
  • Falls to the drains in any wash area, and whether the drains are the right type for the use.
  • Old coatings: a peeling coat has to come off before anything new goes on.
  • The floor loading on the approved plans, if the client will bring heavy machines or tall racking.

If you are weighing a unit in Rawang, Serendah or Shah Alam and are not sure whether its floor suits your process, WhatsApp Jason Low, Probationary Estate Agent PEA 1478 with CID Realtors Sdn Bhd, on +60 12-288 1834.

Questions people ask

01Does every factory floor need epoxy?+

No. Epoxy or a similar seamless resin floor is needed where the use demands an impervious, washable surface, such as food premises under regulation 18 of the Food Hygiene Regulations 2009, or chemical and clean production where the customer's specification calls for it. A dry warehouse or metal workshop usually works on a sound, sealed concrete slab.

02Can epoxy fix a cracked factory floor?+

Not by itself. A coating does not stop a slab from moving, so cracks caused by settlement or overloading come back through the new surface. Find the cause first, repair the cracks and joints, and bring in a professional engineer if the cracks are wide or growing.

03Why does epoxy peel off a factory floor?+

A common reason is moisture rising through the slab: NRMCA notes that slab moisture can cause bond failures of non-breathable coatings, and that manufacturers require the slab to be below a moisture threshold before installation. Poor surface preparation and the wrong system for the traffic are other causes.

04How much does factory floor renovation cost?+

There is no official price list to quote. The cost depends on the area, the slab's condition and the repairs needed first, the moisture level, the system and thickness, details such as coving and drains, and whether work must go around production. Ask every contractor to price the same written specification.

05Can a tenant put epoxy on a rented factory floor?+

Only with the landlord's written consent. The agreement should say who pays, who owns the new finish and whether it must be removed at the end of the tenancy, because removing a bonded resin floor can be a real cost at reinstatement.

Sources

  1. Food Hygiene Regulations 2009 (regulation 18 floors, regulations 13 to 31)
  2. NRMCA Concrete in Practice CIP 28: Concrete Slab Moisture
  3. NRMCA Concrete in Practice CIP 29: Vapor Retarders Under Slabs on Grade

Units on the market nearby

More on selling or letting your factory

All guides: Selling or letting your factory →

Probationary Estate Agent · PEA 1478 · CID Realtors Sdn Bhd E(1) 1855About Jason → · Contact →
Ask Jason about this