Factory Handover Checklist and Dilapidation Report: What to Record When You Take Over a Rented Factory in Rawang, Serendah or Shah Alam
A factory handover in Rawang, Serendah or Shah Alam should end with a dilapidation report signed by landlord and tenant: dated photos and a video of roof, walls, floor, shutters and fittings, meter readings, a list of keys and fixtures, and copies of the fire, electrical and crane papers. Your deposit is judged against it when you leave.
Key Takeaways
- A dilapidation report at handover is a dated record of the factory's condition, signed by the landlord and the tenant. When you move out, your deposit is measured against it.
- I walk the unit with the landlord in a fixed order: roof underside, walls, floor slab, loading bays and roller shutters, offices and toilets, apron, drains and fence, then the switch room and fire equipment, with numbered photos, one video and a marked floor plan.
- Meter readings, keys and utility accounts change hands on the same day. TNB keeps the old account holder liable until that account is closed, so the old closing reading and your opening reading should be the same number.
- The papers go with the keys: the fire certificate if the building is a designated premises, the electrical competent person's inspection records, the crane's certificate of fitness, and the latest cukai pintu and quit rent receipts.
- Whatever the previous tenant left behind, from drums of scheduled waste to unapproved partitions, goes into the report and is dealt with before the keys change hands.
What is a dilapidation report, and why does it matter when you take over a factory?
A dilapidation report records the condition of a building on a fixed date, with photos, notes and measurements, so that later damage can be told apart from what was already there. Councils use the idea in construction. Petaling Jaya's council explains in MBPJ's building control FAQ that a dilapidation report is needed for additions and alterations to an existing building because the works may damage the buildings next door, and that the building owner must settle any complaint if they do.
In a factory tenancy the same record does a different job. At the end of the lease the landlord compares the unit with its "original condition", and the tenant pays for anything beyond fair wear and tear. If nobody wrote the original condition down, the argument comes down to memory. My guide to reinstatement works and getting the deposit back covers the exit; this guide is about the day you take the keys.
One legal point shapes my list. The National Land Code defines land to include all things attached to the earth or permanently fastened to anything attached to the earth. Fixed items such as a mezzanine, a crane, cabling or air-conditioning ducts can therefore be treated as part of the property, so I list every fixture the landlord hands over and, separately, every item the tenant brings in.
When do I schedule the handover, and who should be there?
I try to fix the handover date in the letter of offer and the tenancy agreement, because other dates hang on it: the start of any rent-free fit-out period, the date the tenant's insurance must start and the date the utilities move into the tenant's name. If the landlord still has repairs to finish, I would rather move the handover than take keys to a unit that is not ready, because every day the landlord's contractor is still on site is a day of rent-free time used up. My guide on negotiating factory rent covers how the rent-free period is agreed.
On the day I want four parties there, or their representatives: the landlord, the tenant's operations or facilities person, the tenant's electrical competent person when the supply is large, and me. I bring the approved layout plan, the repair schedule from the tenancy agreement, a camera with the date stamp switched on, a torch, a measuring tape and a printed floor plan to mark defects on.
What do I record, area by area?
I walk the same route every time so nothing is skipped, number each photo and shoot one continuous video of the whole walk. Cracks are measured and marked on the floor plan, not only photographed.
| Area | What I record | Why it matters when you leave |
|---|---|---|
| Roof underside and gutters | Water stains, rust on roof sheets and purlins, daylight through the sheets, blocked or rusty gutters | A leak stain found later is hard to date |
| Walls and cladding | Cracks, dents, holes from old fixings, damp patches | Old holes are easily blamed on the tenant |
| Floor slab | Cracks, broken joints, potholes, oil stains, old floor markings, anchor bolts left in the slab | Slab damage is hard to date afterwards |
| Loading bays and roller shutters | Each shutter opened and closed, motor or chain working, dents, dock levellers | Shutters are used every day, so their starting condition matters |
| Offices, toilets, guardhouse | Ceilings, doors, sanitary fittings, lights, air-conditioners with serial numbers | Small items add up on a deduction list |
| Apron, drains, fence and gate | Cracks and sinking in the apron, covers on drains and sumps, fence and gate condition | Once trucks use the apron, cracks are hard to date |
| Switch room and lighting | Main switchboard condition, number of working lights, labels from past tests | Electrical faults need a date |
| Fire equipment | Extinguishers, hose reels, alarm panel status, service tags and dates | A tenant should not inherit overdue servicing |
For an older unit, or a roof or slab that looks doubtful, a joint photo record is not enough. That is when I suggest a proper building survey; my guide to inspecting a used factory building explains when it is worth paying for one.
Which meters, keys and accounts change hands on the day?
- Meter readings. I photograph the TNB meter and the water meter, and any gas meter, with the date showing, and write the readings into the handover note signed by both sides.
- The TNB account. TNB's change of tenancy page describes it as opening a new account for a customer who moves into a property with ready electrical installations, including a tenant who wants the account in its own name. A business applicant needs an authorisation letter, its registration documents (such as Form 9 and 49) and proof of occupancy, and pays a deposit of two months of electricity, RM10 stamp duty and a processing fee of RM3 for low voltage or RM80 for medium and high voltage. TNB also notes that until an account is closed, its holder is still liable for the electricity used and its payment, so the previous holder's final reading and your opening reading should match. Deposit sizes are in my guide to move-in costs.
- Water. I agree with the landlord whose name the water account stays in and who pays from which reading.
- Keys and access. Every key, remote, access card and padlock is counted and listed. If the tenant changes the locks and the landlord wants a spare key, that goes in writing too.
Which papers should the landlord hand over with the keys?
- Fire certificate. Under the Fire Services Act 1988, every designated premises requires a fire certificate, renewable annually, and where none is in force the owner commits an offence (sections 28 and 33). I ask whether the building is a designated premises, for the current certificate if it is, and for the latest service records of the fire equipment. My guide to the Bomba fire certificate explains who holds it.
- Electrical inspection records. The Electricity Regulations 1994 set the minimum visits by a competent person: at least one a month for an installation up to 600 volts fed through switchgear rated 100 amperes or more, and two a month above 600 volts up to 11,000 volts (regulation 67). The competent person records the findings for the owner (regulation 68). I ask for recent records and the competent person's name, and agree who appoints one from the handover date.
- Crane and lift certificates. Under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, a certificate of fitness is valid for 15 months from the date of inspection, and an owner who sells, leases, transfers or disposes of the plant must notify within 30 days. I write the expiry date into the handover note. More in my guide to factories with overhead cranes.
- Tax receipts. I ask for the latest cukai pintu and quit rent receipts. Under the Local Government Act 1976, a council recovering unpaid rates can seize movable property found on the holding, whoever owns it, which can include a tenant's machines (section 148). Unpaid quit rent can lead to a Form 6A notice of demand and, if still unpaid, forfeiture of the land (National Land Code sections 97 and 100). My cukai pintu guide covers what a tenant can do.
- Approved plans and the CCC or CF. Copies help the tenant's licence application and show what was built with approval.
What happens to what the previous tenant left behind?
- Scheduled waste. Drums, sludge, used oil or contaminated rags should not become yours by default. The Environmental Quality (Scheduled Wastes) Regulations 2005 allow scheduled wastes to be disposed of at prescribed premises only (regulation 4), and a waste generator keeps an inventory for up to three years (regulation 11). I ask for the waste to be removed through a licensed contractor before handover, with the paperwork, and note it in the report.
- Partitions, mezzanines and extensions. If an earlier tenant built something, I record it and ask the landlord to confirm in writing that it was there at handover and whether it was approved. My guide on illegal factory extensions explains why that matters.
- Defects the landlord will fix. Each one goes on a list with an agreed completion date, signed by both sides.
What if a neighbour starts demolition or piling next to the factory?
This is where the construction meaning of a dilapidation report meets a factory tenant or owner. In Rawang, MPS's building plan application form asks an applicant for a demolition permit to submit an engineer's letter of undertaking to be responsible for the structural safety of the existing building and the buildings beside, behind and in front, together with a method statement. If works start next door, I suggest taking your own dated photos and measurements of the existing cracks before the machines arrive, asking the developer for a copy of any condition survey of your building, and telling your landlord in writing.
Buying instead of renting: what changes on completion day?
When a client buys, the handover comes at completion, and the starting point is usually vacant possession unless the factory is sold with a tenant. I still do the same walk, the meter readings and the key count, and the same TNB page says you may apply for a change of tenancy when you purchase from the previous owner. On a tenanted purchase, the sitting tenant's own handover record matters to you as the new landlord; my guide to buying a tenanted factory covers what binds you.
My handover checklist, in the order I use it
- Handover date fixed in writing, with the rent-free period and the tenant's insurance starting from it.
- Approved layout plan, repair schedule and a printed floor plan in hand.
- Joint walk-through with numbered photos, one video and cracks measured.
- Meter readings photographed and signed; TNB and water accounts arranged.
- Keys, remotes and access cards counted and listed.
- Fire certificate, electrical records, crane certificate and tax receipts copied.
- The previous tenant's waste and leftovers cleared, or listed with a date.
- Defects list with completion dates, signed by both sides and attached to the tenancy agreement.
If you are still shortlisting, browse factories for rent in Rawang, Serendah and Shah Alam, and see what I check before renting a factory in Rawang.
To plan the handover of a factory in Rawang, Serendah or Shah Alam, WhatsApp Jason Low (Probationary Estate Agent PEA 1478, CID Realtors Sdn Bhd E(1) 1855) on +60 12-288 1834.
Questions people ask
01What is a dilapidation report for a rented factory?+
It is a dated record of the factory's condition at handover, with numbered photos, a video, notes and crack measurements, signed by the landlord and the tenant. At the end of the tenancy it is the reference for what "original condition" means. Without it, deductions from the deposit come down to each side's memory.
02Who should prepare and sign the factory handover report?+
Either side can prepare it, but the landlord and the tenant, or their representatives, should walk the unit together and sign the same version. I attach it, with the defects list, to the tenancy agreement. A report made by one side alone is easier for the other side to dispute.
03What meter readings should I take when I take over a factory?+
Photograph the TNB meter, the water meter and any gas meter with the date showing, and write the readings into the signed handover note. TNB says the old account holder stays liable until that account is closed, so the previous holder's final reading should match your opening reading. Then apply for the electricity account in your company's name.
04What should I do if the previous tenant left drums or scheduled waste in the factory?+
Ask the landlord to have it removed through a licensed contractor before you take the keys, with the paperwork, and record it in the handover report. The Scheduled Wastes Regulations 2005 allow scheduled wastes to be disposed of at prescribed premises only. If you accept the unit with the waste still inside, it becomes hard to show it was not yours.
05Should the rent-free fit-out period start before or after handover?+
It should start on the handover date, when the unit is actually ready, not on the date the agreement is signed. If the landlord's repairs are still going on, I would rather move the handover date. Write the link between the two dates into the letter of offer and the tenancy agreement.
06Do I need a dilapidation report if my neighbour starts demolition or piling next to my factory?+
It is wise to make your own record. Take dated photos and measurements of the existing cracks before the works start, ask the developer for a copy of any condition survey of your building, and tell your landlord in writing. In Rawang, MPS asks an applicant for a demolition permit for an engineer's undertaking covering the safety of the adjoining buildings.
07Is a phone video enough, or do I need a building surveyor for the handover?+
For a newer unit in fair condition, a joint photo and video record signed by both sides usually does the job. For an older factory, a doubtful roof or slab, or signs of structural movement, pay for a proper building survey before you sign. Keep the surveyor's report with the handover record.
Sources
- Majlis Bandaraya Petaling Jaya: building control FAQ, question 40 on dilapidation reports for additions and alterations
- Majlis Perbandaran Selayang: building plan application form (PB), item 9.0 demolition permit requirements
- National Land Code (Revised 2020), Act 828: section 5 definition of land, sections 97 and 100 (FAOLEX copy of the official revised text)
- myTNB: Business Change of Tenancy, required documents and payments
- Tenaga Nasional Berhad: Close of Account Online
- Laws of Malaysia: Fire Services Act 1988 (Act 341), sections 28 and 33 (AGC reprint)
- Suruhanjaya Tenaga: Electricity Regulations 1994, regulations 67 and 68
- DOSH: Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, P.U. (A) 99
- Local Government Act 1976 (Act 171), section 148 (DBKL copy)
- Environmental Quality (Scheduled Wastes) Regulations 2005, regulations 4 and 11 (FAOLEX copy)
Units on the market nearby
Semi-D Factory for Rent in Saujana Teknologi Rawang, Rawang, 6,525 sq ft
RM 10,500/month
Semi-Detached Factory for Sale or Rent in Saujana Rawang, Rawang, 8,000 sq ft
RM 4,000,000 · RM 15,000/month
Detached Factory for Rent in Batu 17 Rawang, 9,000 sq ft
RM 21,000/month
More on power, height, floor and access
- Factory Ceiling Height vs Clear Height in Rawang, Serendah and Shah Alam: What 30 ft, 40 ft, 12 m and 15 m Suit, Racking Levels and Column Spacing
- Factory With Overhead Crane for Rent or Sale in Rawang, Serendah and Shah Alam: Crane Beams, 5 to 20 Ton Cranes, DOSH Approval and What to Check
- TNB Power Upgrade for a Factory in Rawang, Serendah or Shah Alam: Who Pays, What to Do When the Landlord Says No, Substations and Going Up to 3,000A
- How Much Power Does Your Factory Need? kVA to Amps From the Machine List, Checking the Unit and a TNB Upgrade in Rawang, Serendah and Shah Alam