Factory Wastewater in Rawang, Serendah and Shah Alam: Industrial Effluent Regulations 2009, LUAS Licences and What I Check in the Building
A factory needs a treatment system (IETS) designed by a professional engineer when its process effluent falls under DOE's Industrial Effluent Regulations 2009; only small or clean discharges, such as under 60 m³ a day, are exempt. Selangor's LUAS licenses industrial discharges, at RM200 and RM750 a year. Process effluent needs SPAN approval to enter the IWK sewer.
Key Takeaways
- Three regulators, three routes. Water that leaves a factory in Rawang, Serendah or Shah Alam answers to the Department of Environment (DOE) when it goes to a drain, a river or the ground, to the Selangor Water Management Authority (LUAS) under the state's Zero Discharge Policy, and to the National Water Services Commission (SPAN) when it goes into a public sewer.
- The DOE rules have exemptions, and LUAS fills the gap. The Environmental Quality (Industrial Effluent) Regulations 2009 do not apply to processes producing less than 60 m³ of effluent a day, among other exemptions, yet the LUAS licence for waste and pollutants is written for exactly those smaller industrial premises.
- Where an IETS is required, a professional engineer designs it, DOE is told 30 days before the work starts, the discharge is monitored and reported every month, and a DOE-certified competent person supervises it.
- In the sewer, industrial effluent is "prohibited effluent". It cannot go into an IWK public sewer without SPAN's approval, and regulations made in 2021 set the limits that define it.
- The rivers here feed Klang Valley taps. Pollution traced to Rawang in 2020 and a factory leak into Sungai Kuang in 2024 both shut the Sungai Selangor water treatment plants, and the state now monitors its river basins around the clock (The Star).
Which rules apply to factory wastewater in Rawang, Serendah and Shah Alam?
When a client asks me whether a unit "can take wastewater", I split the question by where the water goes, because each route has its own regulator:
| Where the water goes | Law | Who enforces |
|---|---|---|
| Process effluent to a drain, river or soil | Environmental Quality Act 1974 and the Industrial Effluent Regulations 2009 | DOE |
| Any industrial discharge to a water source in Selangor | LUAS Enactment 1999 and the 2024 licensing regulations behind the Zero Discharge Policy | LUAS |
| Anything into a public sewer or public sewage treatment plant | Water Services Industry Act 2006 and the Prohibited Effluent Regulations 2021 | SPAN, with IWK running the system |
The council comes in through the premises licence: Majlis Perbandaran Selayang for Rawang, Majlis Perbandaran Hulu Selangor for Serendah and Bukit Beruntung, Majlis Bandaraya Shah Alam for Shah Alam. In the 2024 Sungai Kuang case, the state said DOE and the Selayang council would act under their own laws alongside LUAS (NST, July 2024).
Toilets and canteen sinks produce sewage, which is a separate stream. The Water Services Industry Act defines sewage so that it excludes prohibited effluent, and it treats industrial effluent, the liquid waste from production processes at industrial premises, as prohibited effluent (Act 655, section 2). That one definition explains most of what follows.
When does a factory need an industrial effluent treatment system (IETS)?
The Industrial Effluent Regulations 2009 apply to any premises that discharges industrial effluent or mixed effluent onto soil or into inland or Malaysian waters, except the premises listed in their First Schedule (regulation 3). For a manufacturer, the listed exemptions are processing, manufacturing, washing or servicing that:
- produces less than 60 cubic metres of industrial or mixed effluent a day;
- produces effluent with no oil and grease and none of the contaminants listed as parameters (v) to (xv) of the Fifth Schedule, which include mercury, cadmium, chromium, arsenic, cyanide, lead, copper, manganese, nickel and tin; or
- has a total BOD or suspended solids load of no more than 6 kg a day (a concentration of 100 mg/L).
Palm oil mills, natural rubber processing and mining are also outside these regulations because they have their own.
For premises inside the regulations, the owner or occupier must:
- Notify DOE in writing 30 days before the work starts on a new source of discharge, on equipment changes that materially change the quantity or quality of the effluent, or on an upgrade of an existing IETS (regulation 4).
- Appoint a professional engineer to design the IETS to DOE's guidance document and supervise its construction, sign a joint declaration with the engineer, and send DOE the as-built drawings within 30 days of the premises starting operation (regulation 5).
- Mark the point of discharge on layout plans certified by the engineer, submitted 30 days before operation, and give 30 days' notice before moving it (regulation 17).
- Monitor the discharge at their own cost, with flow meters and sampling equipment, and send the record to DOE within 30 days after the end of each month (regulation 7).
- Keep a competent person on duty whenever the IETS runs, meaning someone certified by DOE's Director General (regulation 10). DOE's training institute, EiMAS, runs the certification courses: CePIETSO-PCP for physical chemical systems and CePIETSO-BP for biological ones.
- Never by-pass or dilute. Diverting effluent around any part of the system, or adding outside water to make it less concentrated, are both offences (regulations 18 and 19).
- Report a spill to DOE within six hours and clean it up. DOE can recover its own costs from the owner or occupier (regulation 20).
- Get DOE's written permission before disposing of sludge from the process or the IETS on land or into water (regulation 23).
FactoryHub's national guide to IETS, Standards A and B and sewer connection goes further into treatment types. Here I keep to what changes in this corridor.
Standard A or Standard B: why does the river matter in Rawang, Serendah and Kundang?
Treated effluent must meet Standard A when it goes into inland waters within a catchment listed in the Sixth Schedule, and Standard B everywhere else (regulation 11). The catchments are the areas upstream of water supply intakes for human consumption. The Selangor list includes intakes on Sungai Selangor at Batang Berjuntai and Rasa, on Sungai Batang Kali in Hulu Selangor, and on Sungai Kanching and Sungai Batu in Gombak (Sixth Schedule).
Some of the limits, in mg/L unless stated:
| Parameter | Standard A | Standard B |
|---|---|---|
| pH | 6.0 to 9.0 | 5.5 to 9.0 |
| BOD at 20°C | 20 | 50 |
| Suspended solids | 50 | 100 |
| Oil and grease | 1.0 | 10 |
| Ammoniacal nitrogen | 10 | 20 |
| Copper | 0.20 | 1.0 |
| Nickel | 0.20 | 1.0 |
| Colour (ADMI) | 100 | 200 |
Source: Fifth Schedule of the regulations.
Two incidents show why this matters to anyone setting up in northern Selangor:
- September 2020, Sungai Gong, Rawang. Four Sungai Selangor water treatment plants stopped after odour pollution in the Sungai Gong industrial area, and 1.2 million water accounts in 1,292 areas lost supply. The Menteri Besar said the factory was alleged to have released a solvent into Sungai Gong, which flows into Sungai Sembah and on to Sungai Selangor (Malay Mail). Bernama reported that the factory had operated without a licence since 2014 (Bernama).
- July 2024, Sungai Kuang. A tank leak at a factory processing acrylic materials sent poly methacrylic acid, a scheduled waste, through drains and ditches into Sungai Kuang, and odour was detected in Sungai Kundang and Sungai Sembah. Air Selangor shut the Rantau Panjang plant and Sungai Selangor Phases 1, 2 and 3, and LUAS opened an investigation under section 79(1) of its enactment (NST). The owner was later convicted under the Environmental Quality Act, jailed for three months and fined RM240,000 (The Star, October 2026).
I do not decide which standard applies to a unit: DOE does, from the discharge point. What I do on a viewing in Rawang, Serendah or Kundang is walk the outfall: where the factory's drain leaves the lot, which monsoon drain it joins and which river that drain feeds. In Shah Alam the same walk tells the client which river system the unit drains into, and the question for DOE Selangor is the same.
What does Selangor's Zero Discharge Policy add for a factory?
LUAS enforces the Zero Discharge Policy through the Discharge of Return Water, and Entry or Discharge of Waste and Pollutants (State of Selangor) Licensing Regulations 2024. The state executive council approved them on 15 May 2024, they were gazetted on 20 June 2024 for the whole state, and they replaced the 2012 pollutant discharge regulations. Industry is one of 13 licensed activities, and a premises needs a Discharge of Return Water Licence (AK) and an Entry or Discharge of Waste and Pollutants Licence (BP), both applied for online through LUAS's LEDS system (LUAS).
For industry, LUAS lists these fees and charges:
| Item | Amount |
|---|---|
| Registration fee | RM150 |
| AK licence fee | RM200 a year |
| BP licence fee | RM750 a year |
| Return water, up to 1,000 m³ a month | RM0.10 per m³ |
| Return water, 1,001 to 100,000 m³ a month | RM0.15 per m³ |
| Return water, above 100,000 m³ a month | RM0.20 per m³ |
Sources: LUAS licence fees and return water charges. On the BP side, LUAS charges per kilogram of pollutant above its Standard A limit, for example RM0.06 for BOD, RM0.08 for COD and RM0.22 for oil and grease, and the charge doubles once the discharge is above the Standard B limit (LUAS charge schedule).
The detail I point out to small manufacturers: in the regulations' list of licensed activities, the BP description for industry covers premises producing less than 60 m³ of effluent a day, or a BOD or suspended solids load of no more than 6 kg a day (LUAS list of licensed activities). Those are the same thresholds below which the DOE regulations do not apply. A terrace or semi-detached factory that sits outside the DOE rules is still inside LUAS's.
Enforcement is under way. LUAS told The Star in October 2026 that its officers were visiting industrial areas door to door across Selangor's nine districts, that premises found get a notice and 14 days to apply, and that almost 7,000 licences had been issued. The common problems were breaches of licence conditions and missing water quality reports (The Star). FactoryHub's report on the door-to-door checks has more on the rollout.
Can a factory send its wastewater into the IWK sewer instead?
Not without approval. Section 61 of the Water Services Industry Act 2006 bars anyone from discharging prohibited effluent into a public sewer or public sewage treatment works without SPAN's approval, and section 60 requires SPAN's prior written permission for any private pipe, drain or sewer connected to a public sewer (Act 655). Since 1 December 2021, the Prohibited Effluent Regulations have spelt out what counts, including any discharge above these limits (P.U.(A) 426/2021):
| Parameter | Limit |
|---|---|
| Temperature | 40°C |
| pH | 6.0 to 9.0 |
| BOD | 250 mg/L |
| Suspended solids | 300 mg/L |
| COD | 500 mg/L |
| Oil and grease | 50 mg/L |
| Ammoniacal nitrogen | 30 mg/L |
The schedule also names heavy metals, scheduled wastes, acids and concentrated plating solutions whether neutralised or not, dye wastes, detergents that cause excessive foaming and tankered pollutants. If you process food, my guide to food factory requirements covers the building specs, including drainage.
Rawang has already seen why. In September 2020, SPAN, DOE and IWK inspected sewer manholes around Sungai Gong and found prohibited waste being released into them, after IWK staff at the Rawang Integrated Industrial Park sewage treatment plant found yellow non-sewage waste entering its inlet. SPAN said the plant was designed to treat sewage, not chemicals, and that such a discharge is an offence under section 61 (Astro Awani). So when I look at a unit in Rawang Integrated Industrial Park or any estate on a public sewer, I expect the toilets and pantry to go to the sewer and every process line to go somewhere else.
What do I check in the building before a client rents or buys?
When a client's process uses water, I go through this list with the client and their environmental consultant before we talk about rent:
- What the process will discharge. Litres a day, and whether it carries oil, metals, solvents or dyes. This decides whether the DOE regulations apply and whether LUAS's BP licence is needed.
- Where every drain goes. I ask for the approved drainage and sewerage layout and look for process drains tied into sewer manholes, the pattern SPAN found in Rawang in 2020.
- The outfall. Where the lot's drain meets the monsoon drain, and which river that drain runs to.
- Any existing IETS. The engineer's declaration, the as-built drawings, DOE's acknowledgement of the notification, the monthly discharge records and the name of the competent person. A treatment system without its papers is a project, not an asset.
- Licences and who holds them. The LUAS AK and BP licences, whose name they are in and when they expire, and any DOE licence to exceed the acceptable conditions. That DOE licence costs RM500 plus an effluent-related fee and RM100 to transfer, and its conditions bind a new occupier for 14 days after the change, or until DOE decides a transfer applied for in that time (regulations 26 and 31).
- Space. Room on the lot for tanks, a sump and a sampling point an officer can reach, and somewhere for sludge to wait for collection.
- History. I ask the landlord or seller whether DOE, LUAS or the council has issued any notice, compound or prohibition order on the unit.
For the other checks I run on a factory (title, CCC, power, access), see what I check before renting a factory in Rawang and my note on the Bomba fire certificate. If the process may count as medium or heavy industry, Ms Teh's light, medium and heavy industry guide explains the zoning side.
Who is responsible: the landlord or the tenant?
Most duties in the Industrial Effluent Regulations fall on "the owner or occupier": design and construction, monitoring, operation, the competent person, spill reporting and records. DOE can serve a prohibition order on either of them, stop a plant or process until remedial measures are done, and render the plant inoperative (regulation 30). Breaching most of the regulations carries a fine of up to RM100,000, up to five years in jail, or both, plus up to RM1,000 a day once DOE has served notice to stop (regulation 32).
The Act behind them is now much heavier. Since the Environmental Quality (Amendment) Act 2024 came into operation on 7 July 2024 (Zul Rafique & Partners), the section 25 offence of polluting inland waters carries jail of up to five years and a fine of RM50,000 to RM10 million (Act A1712, section 10).
Because DOE can go after either party, I want the tenancy agreement to say who applies for and holds each DOE and LUAS licence, who pays for upgrades that DOE or LUAS ask for, who employs the competent person, who carries spill clean-up, and what happens to the IETS when the lease ends. Current units are on the factory listings page, and the area pages for Rawang, Serendah and Shah Alam give the wider picture.
To have the drains, outfall and wastewater papers of a factory in Rawang, Serendah, Kundang or Shah Alam checked before you sign, WhatsApp Jason Low (Probationary Estate Agent PEA 1478, CID Realtors Sdn Bhd E(1) 1855) on +60 12-288 1834.
Questions people ask
01What counts as industrial effluent under Malaysian law?+
The Industrial Effluent Regulations 2009 define it as any liquid waste or wastewater generated from a manufacturing process, including the treatment of water for water supply, or any activity at industrial premises. Mixed effluent is wastewater containing both industrial effluent and sewage. Under the Water Services Industry Act 2006, industrial effluent is also prohibited effluent, so it cannot go into a public sewer without SPAN's approval.
02Does a small factory in Rawang or Serendah need an effluent treatment system?+
The DOE regulations do not apply to processes producing less than 60 m³ of effluent a day, effluent without oil and grease or listed metals, or a BOD or suspended solids load of no more than 6 kg a day. That does not free a small factory: LUAS's waste and pollutants licence is written for exactly those premises, and polluting a drain or river is still an offence. Ask your environmental consultant what your process needs before you sign.
03Can I connect my factory's process water to the IWK sewer?+
Only with SPAN's approval. Section 61 of the Water Services Industry Act 2006 bars discharging prohibited effluent into a public sewer without it, and the Prohibited Effluent Regulations 2021 set limits such as 250 mg/L BOD, 500 mg/L COD and 50 mg/L oil and grease, besides naming heavy metals, scheduled wastes and plating solutions. Toilets and pantry go to the sewer; process water normally goes through an IETS to a drain under DOE and LUAS rules.
04Which LUAS licences does a factory in Selangor need, and how much do they cost?+
Under the 2024 licensing regulations behind the Zero Discharge Policy, an industrial premises needs a Discharge of Return Water Licence (AK) and an Entry or Discharge of Waste and Pollutants Licence (BP). For industry LUAS lists a RM150 registration fee, RM200 a year for AK and RM750 a year for BP, plus return water charges of RM0.10 to RM0.20 per cubic metre depending on monthly volume. Applications go through LUAS's online LEDS system.
05What is the difference between Standard A and Standard B?+
Standard A applies to discharges into inland waters upstream of the water supply intakes listed in the Sixth Schedule of the 2009 regulations, and Standard B applies elsewhere. Standard A is stricter: for example BOD 20 mg/L against 50, suspended solids 50 against 100, and oil and grease 1.0 against 10. DOE decides which applies from the discharge point.
06If a tenant's factory pollutes a river, is the landlord liable too?+
Most duties in the 2009 regulations fall on the owner or occupier, and DOE can serve a prohibition order on either of them or recover spill clean-up costs from either. Since 7 July 2024, polluting inland waters under section 25 of the Environmental Quality Act carries jail of up to five years and a fine of RM50,000 to RM10 million. The lease should say who holds each licence, who pays for upgrades and who handles spills.
07Which industrial parks in Rawang, Serendah or Shah Alam provide centralised wastewater treatment?+
There is no public list of industrial parks in Rawang, Serendah or Shah Alam that offer centralised wastewater treatment, so each unit has to be checked separately. In most cases process effluent is treated in the factory's own IETS, under DOE's 2009 regulations and a LUAS licence, and only the toilets and pantry are connected to the sewer. Ask the park manager what the estate provides, then confirm it with DOE Selangor and LUAS.
08Does a factory in Rawang or Serendah need Scheduled Waste management?+
Yes, if the process produces scheduled waste, and the checks in the building are the same ones I run for wastewater. In the 2024 Sungai Kuang case, poly methacrylic acid, a scheduled waste, leaked from a factory tank into the drains. The Prohibited Effluent Regulations 2021 also list scheduled wastes as prohibited effluent, so they may not go into an IWK sewer without SPAN's approval. Ask the landlord for the waste records and confirm what is required with DOE Selangor.
Sources
- Environmental Quality (Industrial Effluent) Regulations 2009, P.U.(A) 434/2009 (application, notification, IETS design, monitoring, competent person, Standards A and B, Sixth Schedule catchments, licence fee, penalty)
- Environmental Quality (Amendment) Act 2024 (Act A1712), section 10: new penalty for section 25 of the Environmental Quality Act 1974
- Zul Rafique & Partners: Environmental Quality (Amendment) Act 2024 in operation from 7 July 2024
- Laws of Malaysia: Water Services Industry Act 2006 (Act 655), section 2 definitions, sections 60 and 61
- Water Services Industry (Prohibited Effluent) Regulations 2021, P.U.(A) 426/2021, in force 1 December 2021
- LUAS: Discharge of Return Water, and Entry or Discharge of Waste and Pollutants (Zero Discharge Policy, 2024 licensing regulations, AK and BP fees, LEDS)
- LUAS: Charges for Discharge of Return Water Licences (schedule of return water charges)
- LUAS: Fourth Schedule, charge calculation for entry or discharge of waste and pollutants
- LUAS: First Schedule, list of licensed activities
- The Star: Selangor's zero discharge policy cuts river pollution (20 October 2026)
- New Straits Times: Factory processing acrylic materials believed to be cause of pollution (July 2024)
- Malay Mail: Cops probing Sungai Gong pollution which led to Klang Valley water supply disruption (4 September 2020)
- Bernama: Pencemaran Sungai Gong, kilang beroperasi tanpa lesen sejak 2014 (7 September 2020)
- Astro Awani: SPAN confirms prohibited waste released near Sungai Gong (26 September 2020)
- EiMAS (DOE): Certified Environmental Professional course in the operation of industrial effluent treatment systems, CePIETSO-PCP
Units on the market nearby
Semi-D Factory for Rent in Saujana Teknologi Rawang, Rawang, 6,525 sq ft
RM 10,500/month
Semi-Detached Factory for Sale or Rent in Saujana Rawang, Rawang, 8,000 sq ft
RM 4,000,000 · RM 15,000/month
Detached Factory for Rent in Batu 17 Rawang, 9,000 sq ft
RM 21,000/month
More on licences, bomba and approvals
- Business Premise Licence for a Factory or Warehouse in Rawang, Serendah and Shah Alam: What MPS, MPHS and MBSA Ask For, Signboard Rules, Timelines and Refusals
- Light Industrial Factory, or Medium or Heavy? How Zoning Classes and Buffer Zones Work in Rawang, Serendah and Shah Alam, and How I Check a Unit
- Illegal Factory Extension in Rawang, Serendah or Shah Alam: What MPS, MPHS and MBSA Can Do and How to Make It Legal
- Bomba Requirements for a Factory or Warehouse in Rawang, Serendah and Shah Alam: Sprinklers, Hose Reels, Hydrants, Alarms and Who Pays