Short answer

When factory water pressure is low, first find out whether the supply at the meter is weak or the loss is inside the premises. The lawful fix is storage plus pumping: a tank sized to the 2014 water rules, with any booster pump drawing from that tank, never from the Air Selangor main. Report weak mains supply on 15300.

Side yard of a factory on hilly ground with a water meter box, a raised sectional steel water tank and a booster pump set on a concrete plinth.
Illustrative image

Key Takeaways

  • Low water pressure in a factory is usually fixed on your side of the meter: a storage tank that is too small or refills too slowly, a blocked strainer, a half-closed valve, a leak, or a pump in the wrong place.
  • Pumping straight off the Air Selangor main is an offence. Under rule 45 of the Water Services Industry (Water Reticulation and Plumbing) Rules 2014, any booster pump must draw from a suction tank, with a fine of up to RM10,000.
  • The same Rules set the storage a factory should hold: one day's demand for most buildings and two days for medium and heavy industry, sized per hectare in the Thirteenth Schedule.
  • If the supply reaching your meter is weak, report it to Air Selangor on 15300 or through its app, and keep readings and times as evidence.
  • Before you rent or buy in Rawang, Serendah, Bukit Beruntung, Kundang or Shah Alam, I check the meter, the tank, the pump set and how long the tank takes to refill, because a weak supply is cheap to spot and costly to discover after move-in.

Why is the water pressure in my factory low?

When a client in Rawang or Serendah tells me the taps in the factory run weak, I start by splitting the problem in two: is the water arriving at the meter weak, or is it arriving fine and losing pressure inside the premises? The answers lead to different people and different bills.

Weak supply at the meter can come from heavy demand in the area at peak hours, a unit sitting on higher ground or at the far end of a supply line, works or a burst on the public main, or a constant flow valve fitted on the inlet. The Rules allow the water operator to require a factory's tank inflow to be regulated through a constant flow valve, with the fittings paid for by the factory owner (rule 95). A factory can therefore have a lawful limit on how fast its tank fills.

Weak flow inside the factory is more common in older units I see in Bukit Beruntung and the older Rawang estates: a strainer or float valve clogged with silt, a stop valve left half shut after repairs, a service pipe that was sized for a small office and never upgraded, internal leaks, or a roof tank that sits too low to give a useful head at the far end of the building.

What do the water rules say a factory should have?

The Water Services Industry (Water Reticulation and Plumbing) Rules 2014, made under the Water Services Industry Act 2006, set the basics that decide how much pressure and storage a factory can count on:

Rule What it says What it means for a factory
Rule 17 A developer's external pipes must serve buildings up to 15 m high without pumping at peak flow, with at least 7.5 m of residual pressure above the highest supply level 7.5 m of water is roughly 0.7 bar: enough to fill a tank, not to run process equipment directly
Rule 45 No pump that can raise, lower or affect mains pressure downstream of the meter unless a suction tank is installed upstream of it A booster pump bolted onto the incoming pipe is an offence, fine up to RM10,000
Rule 46 A storage tank must sit between the meter and all taps, except a kitchen tap Factory taps and machines are fed from the tank, not the main
Rule 50 and Thirteenth Schedule Storage of at least one day's demand; two days for medium and heavy industry One day's figure: 33,000 litres per hectare for light industry, 50,000 for medium, 65,000 for heavy; 1,500 litres per unit for a warehouse or a single or semi-detached workshop
Rule 81 Water for private fire hydrants and fire fighting devices is separately metered Fire water and process water are separate questions
Rule 95 The operator may require a constant flow valve on a factory's tank inflow A slow refill may be a fitting the operator asked for, not a fault

So the lawful fix for low pressure inside a factory is almost always storage plus pumping from that storage: water fills a ground or suction tank at whatever rate the main gives, and a pump set lifts it to a roof tank or pressurises the internal pipes.

How much water supply does a factory need?

For planning, the 2014 Rules give a factory one day's demand of 33,000 litres per hectare of light industry, 50,000 for medium and 65,000 for heavy industry, and 1,500 litres per unit for a warehouse or a single or semi-detached workshop. The factory must store at least one day of that demand, and two days for medium and heavy industry. On a 1-acre lot, about 0.405 hectare, my arithmetic gives:

Industry class on a 1-acre lot One day's demand Storage to hold
Light industry about 13,400 litres about 13,400 litres (one day)
Medium industry about 20,200 litres about 40,500 litres (two days)
Heavy industry about 26,300 litres about 52,600 litres (two days)

These are the design figures the plumbing is sized to, not a measure of what your process uses. A food, plating or cooling-water process can need far more, so I ask the client for their own daily use from the current plant or the machine makers, and if it is well above the schedule I ask Air Selangor in writing whether the main at that lot can supply it before the client signs. Fire water is a separate system and is metered separately under rule 81.

What should I do first when the pressure drops?

This is the order I suggest to an occupier before anyone spends money:

  1. Read the meter and time it. Close all outlets, then watch the meter dial and the tank inlet at a busy hour and late at night. If the tank fills well at night and poorly in the day, the problem is supply at peak hours, and more storage usually solves it.
  2. Walk the pipe from meter to tank. Look for a stop valve not fully open, a clogged strainer, a stuck float valve or wet ground that suggests a leak. Air Selangor says the customer is responsible for a meter inside private property and bears the cost of replacing it (Air Selangor meter FAQ).
  3. Check the tank against the Schedule. A unit that changed from storage to production often keeps a tank sized for the old use.
  4. Report supply problems to Air Selangor. Call 15300 or use the Air Selangor app or website. Leaks on the public side, such as a burst pipe or a meter leak, go through the app's Report Leaks feature, and each report is reviewed before repairs (Air Selangor).
  5. If you doubt the meter, rule 78 lets a consumer ask for the meter to be tested, either by the operator against a deposit or by an independent party recognised by SPAN.

Who can install a tank or pump, and who pays?

Internal plumbing work is not a handyman job under the Rules. Rule 31 requires the owner to appoint a competent person to prepare internal plumbing plans and lodge them with SPAN before fittings are installed, and rule 32 requires a permit holder to disinfect new or altered fittings before use. Tanks larger than 10 cubic metres must be compartmentalised, sit in a secured area and be lined if built of concrete or steel panels (rule 49). For a new building or a premises without a meter, Air Selangor takes the new account application through a licensed plumber.

Who pays depends on the tenancy agreement. A bigger tank or a pump set is an improvement to the building, so I ask landlords and tenants to agree in writing before work starts: who pays, who owns the equipment at the end, and whether it must be removed. My guide on who pays for repairs in a rented factory covers how that split is usually written.

What do I check on a site visit in Rawang, Serendah or Shah Alam?

Water is on my checklist next to power and access, especially for food, plating, washing and cooling lines. On a viewing I look at:

  • the meter size and type (Air Selangor notes electromagnetic meters are common in high-use commercial and industrial buildings, see its meter FAQ);
  • the ground or suction tank and the roof tank: size, material, condition, and the height of the roof tank against the furthest outlet;
  • the pump set: whether it draws from a tank as rule 45 requires, whether there is a standby pump, and its electrical supply;
  • whether there is a separate fire water tank and meter for hydrants or hose reels, which I raise with the Bomba fire certificate checks;
  • recent water bills, which show real consumption and any long gaps;
  • how fast the tank refills when we open a tap at the far end.

For process water, compare the tenant's daily need with the tank size before signing. A food factory needs reliable potable water for cleaning, and whatever goes in must come out, which brings in the industrial effluent rules. In hilly parts of Rawang, Serendah and Bukit Beruntung I pay attention to units on the higher rows of an estate, and I put water questions on the same list as my checks before renting a factory in Rawang.

Will the public supply improve on its own?

Some of it is being worked on. Air Selangor has said it is doubling pipe replacement from 150 km to 300 km a year from 2024 to cut leaks and losses (Air Selangor). That helps the network over years, not a factory that needs water next month, so I plan on storage and pumping inside the premises rather than waiting. Water tariffs were also revised from 1 September 2025 (Air Selangor), which is one more reason to fix internal leaks early.

If you are weighing a factory in Rawang, Serendah or Shah Alam and want the water supply checked on the viewing, WhatsApp Jason Low, Probationary Estate Agent PEA 1478 with CID Realtors Sdn Bhd, on +60 12-288 1834.

Questions people ask

01Can I install a booster pump on the incoming water pipe of my factory?+

No. Rule 45 of the Water Services Industry (Water Reticulation and Plumbing) Rules 2014 bans any pump that can raise, lower or affect mains pressure downstream of the meter unless a suction tank is installed upstream of it. The fine is up to RM10,000. The pump must draw from a tank that the main fills.

02How big should a factory water tank be?+

The 2014 Rules ask for storage of at least one day's demand, and two days for medium and heavy industry. The Thirteenth Schedule sets one day at 33,000 litres per hectare for light industry, 50,000 for medium and 65,000 for heavy, and 1,500 litres per unit for a warehouse or a single or semi-detached workshop. A process that uses more water needs a larger tank.

03Who do I call about low water pressure in Selangor?+

Air Selangor handles supply up to the meter: call 15300 or use the Air Selangor app or website. Leaks on the public side can be reported through the app's Report Leaks feature. Problems after the meter, such as tanks, pumps and internal pipes, are the owner's or occupier's to fix with a plumber.

04Why does my factory tank refill slowly?+

Common reasons are heavy demand at peak hours, a unit on higher ground or at the end of a supply line, a clogged strainer or float valve, a partly closed valve, or a leak. The water operator may also require a constant flow valve on a factory's tank inflow under rule 95, which limits the refill rate by design.

05Does the landlord or the tenant pay for a bigger tank or a pump?+

It depends on the tenancy agreement. A bigger tank or pump set improves the building, so both sides should agree in writing before work starts on who pays, who owns the equipment at the end of the tenancy and whether it must be removed.

06Can I ask Air Selangor to test my water meter?+

Yes. Rule 78 of the 2014 Rules lets a consumer who doubts a meter's accuracy ask for it to be tested, either by the water operator against a deposit or by an independent party recognised by SPAN at the consumer's cost.

07How much water does a factory need per day?+

For design, the Water Services Industry (Water Reticulation and Plumbing) Rules 2014 use 33,000 litres per hectare a day for light industry, 50,000 for medium and 65,000 for heavy industry, and 1,500 litres per unit for a warehouse or small workshop. A 1-acre light industry lot works out at about 13,400 litres a day. A process that uses more water needs Air Selangor's written confirmation of supply.

Sources

  1. Water Services Industry (Water Reticulation and Plumbing) Rules 2014, P.U. (A) 36
  2. Air Selangor: FAQ, maintenance and replacement of meter
  3. Air Selangor: FAQ, understanding Air Selangor's water meter
  4. Air Selangor Hydro Hub: report leaks via the Air Selangor app and website
  5. Air Selangor Hydro Hub: sustainable water management practices aimed at reducing water loss
  6. Air Selangor Hydro Hub: new water tariff beginning 1 September 2025

Units on the market nearby

More on choosing an area or industrial park

All guides: Choosing an area or industrial park →

Probationary Estate Agent · PEA 1478 · CID Realtors Sdn Bhd E(1) 1855About Jason → · Contact →
Ask Jason about this