A cosmetics factory needs no manufacturer's licence, but each product must be notified to NPRA and made in GMP-compliant premises licensed by the council, DOE and Bomba where required. A pharmaceutical plant needs a Manufacturer's Licence from the Drug Control Authority after an NPRA inspection against the PIC/S GMP Guide, whose Annex 1 sets cleanroom grades and air rules for sterile products.
Key Takeaways
- Cosmetics: notification, not a manufacturer's licence. NPRA's April 2023 GMP inspection FAQ says no Manufacturer's Licence is currently required for cosmetics manufacturers; a product may be made once it is notified, and the maker must still comply with GMP (NPRA GMP FAQ).
- Pharmaceuticals: a Manufacturer's Licence from the Drug Control Authority. GMP compliance is a condition for product registration and for that licence, and pharmaceutical plants are inspected against the PIC/S Guide to Good Manufacturing Practice.
- The premises come first. NPRA's FAQ says registered products and notified cosmetics must be made in GMP-compliant premises, which should be licensed by the local council, the Department of Environment and/or Bomba, and that a new plant may submit its layout to NPRA for evaluation.
- Air rules depend on the product. For sterile medicines, the EU and PIC/S Annex 1 (2022) sets cleanroom grades A to D, a filtered air supply at positive pressure and a guidance value of at least 10 Pa between adjacent rooms of different grades. Non-sterile and cosmetic plants set their air handling from the GMP guide that applies and their own contamination risk assessment.
- Cleanroom cost has no public price list. It is driven by the grade, the area, the air handling plant, the room build and the testing, and by how much the building shell can carry.
What licences does a cosmetics factory need?
When a client tells me they want to make skincare, haircare or other cosmetics in Shah Alam or the northern areas, I lay out the approvals in this order:
- Product notification with NPRA. Under NPRA's Guidelines for Control of Cosmetic Products in Malaysia (first revision, 2017), the cosmetic notification holder submits each product through NPRA's Quest system and may manufacture or import it once the Notification Note is issued. The holder keeps a Product Information File on quality, safety and claimed benefit, available on request. NPRA's 2023 FAQ refers to a second edition of these guidelines dated August 2022, so the current text is the one to follow.
- Cosmetic GMP. All cosmetic products must be made under the Guidelines for Cosmetic Good Manufacturing Practice or an equivalent, and local manufacturers are inspected periodically by NPRA's GMP auditors. A new cosmetics maker that has not notified any product gets an initial inspection.
- No manufacturer's licence, for now. The FAQ answers this directly: currently no Manufacturer's Licence is required for cosmetics manufacturers.
- The building's own licences. The premises should be licensed by the local council, the DOE and/or Bomba. The council business licence is explained in my business premise licence guide, and whether the company also needs a MIDA manufacturing licence depends on its size, covered in my MIDA manufacturing licence guide.
- Halal, if you want the logo. The 2017 guidelines say a halal logo may be used voluntarily on a notified cosmetic once JAKIM or a body JAKIM recognises has certified it.
There is also a route without a factory: the FAQ notes that an entrepreneur may build their own plant or appoint a GMP-compliant contract manufacturer. For a small first range, that is worth pricing before signing a lease.
What licences does a pharmaceutical factory need?
A pharmaceutical plant is regulated more tightly. GMP compliance is required for product registration and to apply for a Manufacturer's Licence with the Drug Control Authority, and a new manufacturer goes through a pre-licensing inspection before it can register products and apply for that licence. Pharmaceuticals are inspected against the PIC/S GMP Guide, traditional products and health supplements against NPRA's own GMP guideline. If a manufacturer fails to comply, new registrations can be rejected, renewals refused and registered products suspended, and the Manufacturer's Licence may be revoked under regulation 17(1) of the Control of Drugs and Cosmetics Regulations 1984 (NPRA GMP FAQ).
For the building, the practical step is NPRA's evaluation of the manufacturing plant layout (form NPRA/431/12-3), which a new plant may submit before it builds or fits out. I ask clients to do that before they commit to a unit, because a layout that does not work for material and people flow is far cheaper to change on paper.
What air-conditioning and filtration does a pharmaceutical factory need?
For sterile medicines the rules are specific. The EU GMP Annex 1 of August 2022, revised jointly with the PIC/S Committee, defines four grades of cleanroom or zone:
| Grade | What it is for, in the Annex's words |
|---|---|
| A | The critical zone for high-risk operations such as aseptic filling, usually under unidirectional airflow within RABS or isolators |
| B | The background cleanroom for grade A in aseptic preparation and filling, with air pressure differences continuously monitored |
| C and D | Less critical stages of aseptically filled products, a background for isolators, or the preparation and filling of terminally sterilised products |
What that means for the air system:
- Filtered air at positive pressure. Cleanrooms should be supplied with filtered air that keeps a positive pressure and/or airflow relative to the lower grade around them, and adjacent rooms of different grades should have an air pressure difference of at least 10 Pa as a guidance value. Containment of hazardous materials can change this, with pressurised airlocks and treatment of exhaust air.
- Surfaces and drains. Exposed surfaces should be smooth, impervious and unbroken, and sinks and drains are prohibited in grade A and B areas.
- Testing for the life of the plant. Requalification includes particle classification, filter integrity tests, airflow volume and the pressure difference between rooms, at least every 6 months for grades A and B and every 12 months for C and D.
For tablets, capsules, creams and other non-sterile products, and for cosmetics, Annex 1's grades are not the starting point. The air handling, temperature, humidity and filtration are set under the GMP guide that applies to the product and the company's own contamination control, and NPRA sees the result at the layout evaluation and the inspection. I always ask the client's quality person for the room classes they need before we look at buildings, because the answer decides the shell.
How much does it cost to convert a factory into a cleanroom?
I have not found an official or published cost figure I could quote for a cleanroom fit-out in Malaysia, so I give none. What I tell clients is what drives the number, so they can brief designers and compare offers fairly:
- The grade and the share of the floor that needs it. A small grade C or D suite inside a plain factory costs far less than a large area kept to a higher grade.
- The air handling plant. Filtered supply air, pressure cascades, temperature and humidity control and their back-up are usually the main cost.
- The room build. Wall and ceiling panels, doors, airlocks, pass-through hatches, a seamless floor and coved joints; my factory floor epoxy guide covers what a resin floor needs from the slab underneath.
- Qualification and requalification. The initial tests and the periodic retesting described above are a running cost, not a one-off.
- What the shell can take. Clear height for the ceiling void and ducts, roof strength for the plant, and the TNB supply for a plant that runs day and night.
What do I check in a building before a client signs?
- Clear height for a walkable ceiling or ductwork above the cleanroom ceiling; see my clear height guide.
- Power for air handling units and chillers that never switch off; my kVA to amps guide shows how to size it.
- Wastewater and scheduled waste routes for wash water, solvents and rejects; see my factory wastewater guide.
- Location and neighbours: dust, odour or vibration next door can make an area hard to keep clean. My industry-by-area guide lists the estates I look at for pharmaceutical and cleanroom work.
- The landlord's consent and reinstatement for a fit-out that may stay or may have to be removed; see my renovation and reinstatement guide.
If you are planning a cosmetics or pharmaceutical plant in Shah Alam, Rawang or Serendah and want to shortlist buildings that suit the approvals, WhatsApp Jason Low, Probationary Estate Agent PEA 1478 with CID Realtors Sdn Bhd, on +60 12-288 1834.
Questions people ask
01Does a cosmetics factory in Malaysia need a manufacturer's licence?+
No, not at present. NPRA's 2023 GMP FAQ says no Manufacturer's Licence is currently required for cosmetics manufacturers: a product may be made once it is notified to NPRA. The maker must still comply with cosmetic GMP and is inspected by NPRA, and the premises need the council, DOE and Bomba approvals that apply.
02Can I make cosmetics without my own factory?+
Yes. NPRA's FAQ says an entrepreneur may build a factory or appoint a GMP-compliant contract manufacturer. The product still has to be notified to NPRA, and the notification holder keeps the Product Information File.
03What licence does a pharmaceutical factory need?+
A Manufacturer's Licence from the Drug Control Authority. GMP compliance is a condition for it and for product registration, a new manufacturer goes through a pre-licensing inspection, and pharmaceutical plants are inspected against the PIC/S GMP Guide.
04What pressure difference is needed between cleanrooms?+
For sterile manufacturing, EU and PIC/S GMP Annex 1 (2022) gives a guidance value of at least 10 Pa between adjacent rooms of different grades, with filtered air keeping the cleaner room at positive pressure. Containment of hazardous materials can change the arrangement.
05How much does a cleanroom fit-out cost?+
There is no official price list to quote. The cost depends on the grade, how much of the floor needs it, the air handling plant, the room build and the testing, and on whether the building has the clear height, roof strength and power for it.
06Can NPRA check my factory layout before I build?+
Yes. NPRA's GMP section evaluates manufacturing plant layouts on form NPRA/431/12-3, which a new manufacturer may submit before building or fitting out. Fixing material and people flow costs least at that stage.
Sources
Units on the market nearby
Warehouse for Rent in HICOM Glenmarie Industrial, Shah Alam, 85,894 sq ft
RM 210,000/month
Industrial Land for Sale in Eco Ardence, Shah Alam, 2.38 Acres, Freehold
RM 21,771,450
Warehouse for Sale or Rent in Bukit Jelutong, Shah Alam, 143,864 sq ft
RM 88,880,000 · RM 350,000/month
More on licences, bomba and approvals
- Malaysia, Vietnam or Thailand for a New Factory? What to Compare, and Where Rawang, Serendah and Shah Alam Fit if You Choose Malaysia
- Setting Up a Factory in Malaysia as a Chinese or Taiwanese Manufacturer: Tax Incentives, Hiring Technicians From China and the Steps in Rawang, Serendah and Shah Alam
- How Do China Plus One and Green Factories Affect Industrial Property, and How Do You Plan Your Exit? Rawang, Serendah and Shah Alam
- Can a Factory Install a Backup Generator, Solar, EV Chargers, a Large Water Tank or Business Fibre? Rules and Consents in Rawang, Serendah and Shah Alam