Manufacturing Licence in Malaysia for a Factory in Rawang, Serendah or Shah Alam: Who Needs One, How to Apply to MIDA, How Long It Takes and What Changes When You Move, Expand or Sell
A manufacturer in Rawang, Serendah or Shah Alam with RM2.5 million or more in shareholders' funds or 75 or more full-time paid employees needs a MIDA manufacturing licence under the Industrial Co-ordination Act 1975. Apply via InvestMalaysia; MIDA's charter gives 60 working days, 7 on the fast track, from complete information. Moves, new products or transfers need approval.
Key Takeaways
- The trigger is your company, not the building. Under the Industrial Co-ordination Act 1975 (ICA), a manufacturer with shareholders' funds of RM2.5 million or more, or 75 or more full-time paid employees, needs a manufacturing licence (ML). MIDA takes the application and MITI approves it. Below both lines you may ask MIDA for an ICA 10 exemption letter instead.
- The factory you rent or buy feeds MIDA's numbers. MIDA's capital investment per employee test (at least RM140,000) counts ten years of rent for land and building, so the lease you are about to sign affects whether the project passes.
- Timing: MIDA's client charter gives 60 working days on the normal track and 7 working days on the fast track, counted from complete information. Manufacturing without a required licence is an offence.
- The licence follows the place and the product. The Act issues a separate licence for each place of manufacturing, needs prior approval for any product not on the licence, and bars a transfer to another person without approval.
- Check before you sign. The council licence from MPS, MPHS or MBSA, the zoning class and MIDA's criteria should all be confirmed for the exact unit before the tenancy or SPA is signed.
Does your factory in Rawang, Serendah or Shah Alam need a MIDA manufacturing licence?
Section 3 of the Industrial Co-ordination Act 1975 says no person may engage in manufacturing activity without a licence, and MIDA applies that to manufacturers with shareholders' funds of RM2.5 million and above, or 75 or more full-time paid employees. The Act defines manufacturing widely: making, altering, blending, ornamenting, finishing or otherwise treating any article or substance for use, sale or delivery, including the assembly of parts, but not activity normally associated with retail or wholesale trade. Storage and distribution alone are not on that list. Blending or assembly inside a warehouse can be, so ask MIDA if your process sits near the line.
Both triggers have exact definitions, and this is where owners most often guess wrong:
| Test | How MIDA counts it | What catches people out |
|---|---|---|
| Shareholders' funds of RM2.5 million or more | Paid-up capital, reserves, share premium and the profit and loss balance | MIDA leaves out any capital reserve created by revaluing fixed assets, so revaluing a factory you own does not push you over the line |
| 75 or more full-time paid employees | People working at least six hours a day, 20 days a month, for 12 months a year, paid directly by the company | Travelling sales, engineering, maintenance and repair staff count, and so do directors unless they are paid only to attend board meetings |
| Below both lines | No licence needed, but you may apply for an ICA 10 confirmation letter | The letter lets the company apply for import duty and sales tax exemptions on machinery and raw materials, and for investment incentives |
Three activities are exempt whatever their size: milling paddy into rice, milling oil palm fresh fruit into crude palm oil, and processing raw natural rubber (MIDA ML guideline, 6 June 2024).
The penalty for manufacturing without a required licence is a fine of up to RM2,000 or up to six months in prison, plus a further fine of up to RM1,000 for every day the default continues (section 3(2)). The licence also replaces nothing else: section 8 says holding one does not relieve a manufacturer from any other written law, which in practice means the council licence, Bomba, the Department of Environment (DOE) and DOSH.
What does MIDA check, and how does the factory you rent or buy change the result?
The 2024 guideline moved the ML to self-assessment and self-declaration, and sets four tests on top of the threshold:
- Capital investment per employee (CIPE) of at least RM140,000. Capital investment divided by full-time employees, both taken from the company's financial year.
- At least 80% of full-time staff are Malaysians. Workers supplied by an outside contractor and not on your payroll do not count as your employees in this sum. The guideline's relaxation of this rule ran only until 31 December 2024.
- At least 25% managerial, technical and supervisory (MTS) staff, or value added of at least 40%.
- The project fits national economic and social objectives and the orderly development of manufacturing.
The CIPE test is the one that touches property. MIDA's appendix says it counts fixed asset investment "including payment of rental (10 years) for land and building". A factory the company buys is a fixed asset; a factory it rents is counted as ten years of rent.
As an illustration, take the JPPH-registered median rent for a semi-detached factory in Shah Alam: RM17,300 a month for about 8,810 sq ft, from 24 registered tenancies (FactoryHub, Shah Alam registered transactions).
| Item | Figure |
|---|---|
| Ten years of rent at RM17,300 a month | RM2,076,000 |
| Capital investment needed for 75 full-time employees (75 x RM140,000) | RM10,500,000 |
| Left for machinery and other fixed assets if you rent | RM8,424,000 |
| Registered median price of a semi-detached factory in Shah Alam | RM5.92 million |
| Left for machinery and other fixed assets if you buy at that price | RM4,580,000 |
That is arithmetic on registered figures, not a forecast for your unit, and MIDA decides how your own costs are counted. The point is that the rent you are about to sign is part of the licence test.
The 80% rule touches the site too. A plant in Serendah or Bukit Beruntung that plans to run mostly on foreign workers should test that plan against MIDA's rule before committing to a building. My guide on hiring factory workers in Rawang, Serendah and Shah Alam covers the local labour side.
How do you apply to MIDA, and how long does it take?
Applications for an ML and for an ICA 10 letter are made online only, through MIDA's InvestMalaysia portal; MIDA does not accept hard copies (MIDA FAQ). The steps:
- Register the company on the InvestMalaysia portal.
- Get a digital certificate for the authorised signatory, used to sign the application. A law firm guide published through AmCham Malaysia names POS Digicert as the issuer.
- Fill in the e-ML form. MIDA's guideline points to the sections on project cost, financing, manpower and product pricing, which is where the CIPE, MTS and value added figures come from.
- Answer MIDA's questions. MIDA sends an acknowledgement letter naming the officers handling the file. The law firm guide notes MIDA may ask for more documents and may visit the premises.
- Approval. MIDA's Industry Division processes the application and MITI approves it (MIDA briefing, 2019).
On timing, MIDA's client charter gives 60 working days on the normal track and 7 working days on the fast track, counted from the date complete information is received. The clock does not run while documents are missing. The law firm guide puts the whole process, from first submission to final approval, at about 3 to 5 months, depending on how complete the file is and how quickly the company answers.
On cost, MITI's February 2025 townhall deck lists the current fee as RM1,500 for an ML and RM1,000 for an ICA 10 letter, and says the ML has no validity period under the current Act. Confirm the fee shown on the portal when you apply.
For a Selangor project you can also speak to MIDA's state office, which MIDA lists at 22nd Floor, Wisma MBSA, Persiaran Perbandaran, Shah Alam (03-5518 4260). Headquarters is MIDA Sentral in Kuala Lumpur (03-2267 3633).
Smaller manufacturers should note the order of papers. For an ICA 10 confirmation letter, MIDA asks for the company profile from SSM, a manufacturing process flow chart and the business licence from the local authority, so for them the council licence comes first. Which council that is, and what it wants, is in my business premise licence guide: MPS for Rawang and Kundang, MPHS for Serendah, Sungai Choh, Bukit Beruntung and Batang Kali, and MBSA for Shah Alam.
Can you start production as soon as you rent the factory?
Not if your company is over the threshold and the licence has not been issued, and not before the other approvals either. Section 3 bars manufacturing activity without the licence, and section 8 keeps every other approval in place. In practice the ML runs alongside the local approvals:
| Approval | Who issues it | What it depends on |
|---|---|---|
| Manufacturing licence or ICA 10 letter | MIDA, approved by MITI | Company figures, product list, factory address |
| Business premise licence | MPS, MPHS or MBSA | CF or CCC, industrial status, stamped tenancy |
| Fire certificate where required | Bomba | Fire systems and the use of the building |
| Environmental approvals | DOE | Emissions, effluent, scheduled waste |
| Approval to install boilers, pressure vessels and cranes | DOSH | Installation and inspection at this site |
When I plan a move-in for a manufacturer, I put the MIDA file on the same timeline as the TNB supply, the fit-out permits and DOSH, which my factory relocation timeline guide sets out step by step. The least costly way to absorb a slow approval is a rent-free fit-out period agreed before signing, covered in my guide on negotiating factory rent.
Do you need a new licence if you move your factory, say from Shah Alam to Serendah?
The licence is tied to a place. Section 4(2) of the Act lets one application cover several products and several places, but "a separate licence shall be issued for each place of manufacturing activity". So a move needs MIDA, and MIDA handles it as a post-licensing application rather than a fresh start. Its post-licensing checklist separates two cases:
- Change of factory location, when you move to another factory: a letter from the company with the justification, plus the original ML (or the interim approval letter and its Lampiran A).
- Amendment of address or factory location, when the factory stays but its address changes, for example after a lot or road renumbering: the same papers plus a confirmation letter from the local authority.
MIDA's 2019 briefing lists the issue of a licence as the step that follows these amendments, and the MIDA FAQ lists post-licensing applications among the modules on the InvestMalaysia portal. If the company holds Pioneer Status, the pioneer certificate needs its own amendment for the new location. If you keep the old plant running and add a second one, the second place needs its own licence.
Three local approvals have to be done again at the new site. The council licence does not travel: MPHS's licence conditions say a premise licence cannot be transferred without the council's written approval and the council must be told if the activity changes, is added, ends or moves, and a move from Shah Alam to Serendah means a new council anyway. DOSH approval to install prescribed plant has to be obtained again, and the TNB supply has to be in place at the new unit. Section 6 also lets the licensing officer revoke a licence if the holder is no longer engaged in the licensed activity, so tell MIDA before the old site stops, not after.
Can a manufacturing licence be transferred to a buyer or a new owner?
Not without approval. Section 7 says no licence is transferable from a manufacturer to any person without the prior approval of the licensing officer, and lists the cases where a transfer may be authorised: death, incapacity, bankruptcy, liquidation, the appointment of a receiver or manager, or where refusing would be unjust. The application is made in writing, and a refusal can be appealed to the Minister within 45 days (section 13).
For property deals this splits three ways:
- You buy the factory building. You get land and a building; the seller's ML stays with the seller. You apply in your own company's name, or for a change of location if you are already licensed elsewhere.
- You buy the company that holds the licence. The licence stays with the company, but MIDA lists a transfer of shares and a change of the board of directors as an application to update the licence conditions, with a justification letter, the original ML and a board resolution. A change of company name has its own amendment. My guide on buying a factory in a company name or your own name covers the property side of that choice.
- You sell or let a factory to a licensed manufacturer. Their licence names your address. If they later move out, the change is between them and MIDA, but a tenant still waiting for its ML may ask for a later start date or a longer rent-free period.
What if you add production lines or start a new product?
Section 7A says a manufacturer shall not make any product other than those specified in its licence without the licensing officer's prior approval. Stopping a listed product only needs written notice. MIDA's manufacturing forms page has one route for both kinds of growth: an application for an ML on an expansion and/or diversification project, by a licensed manufacturer or by an existing manufacturer without a licence. The 2024 guideline names four project types: new, expansion, diversification and regularisation. The law firm guide explains that regularisation is for a company that is already producing and has grown past the threshold without a licence.
Two practical points from the factory side:
- Growth can trigger the licence. The 75th full-time hire, or retained profits that lift shareholders' funds to RM2.5 million, brings an unlicensed manufacturer under the Act. If a move to a bigger factory in Rawang or Serendah is part of that growth, apply before the move, not after.
- The council licence lists the activity too. MPS says a licensed premises may be used only for the activity written on the licence, and in December 2024 it closed a Rawang factory and terminated its licence because it was licensed to make electrical equipment but was producing steel and aluminium (The Star). A new line needs both papers updated, and often more power; see my kVA to amps and TNB upgrade guide.
How do you confirm a licence is possible before signing the tenancy or SPA?
When a manufacturer asks me to shortlist factories in Rawang, Serendah or Shah Alam, I raise MIDA before the offer letter, not after. My checks before anyone signs:
- The threshold sum. Shareholders' funds without any revaluation reserve, and full-time headcount by MIDA's definition, today and after the move.
- The four tests with this unit's numbers. Put the rent you are about to sign, times ten years, into the CIPE sum, or the purchase price if you are buying.
- A call to MIDA with the address. Give MIDA's Selangor office or your MIDA officer the product list, the process and the lot address. MIDA's FAQ says it helps investors secure factory sites and speed up approvals for building plans, certificates of fitness and business licences.
- The council licence for this exact unit. CF or CCC, industrial status and a paid assessment bill, as set out in my business premise licence guide.
- The zoning class against the process. My light, medium and heavy industry guide and Ms Teh's page on light, medium and heavy industry explain why a medium industry process may not be licensable in a light industry estate.
- Timing in the documents. The tenancy start date, the rent-free period and, if needed, a condition tied to approvals are for you and your lawyer to settle before signing.
What is changing: the proposed Industrial Development Bill
MITI has proposed replacing the ICA. Its February 2025 townhall deck put forward a new Act that would use sales turnover instead of shareholders' funds, tiered fees and penalties by company size, a licence validation every three years, and revocation where no manufacturing starts within 24 to 36 months. MIDA's Investment Performance Report 2025 says the Industrial Development Bill is intended to replace the ICA and points to its introduction in 2026. These are proposals. Until a new Act is passed and in force, the ICA rules above apply, so check with MIDA when you file.
Related questions, answered in detail on FactoryHub
- How do Taiwanese enterprises set up factories in Malaysia? Incorporate a Sdn Bhd with paid-up capital, obtain a MIDA licence and deal with the duty on used machines.
- What conditions do Japanese enterprises need to set up factories in Malaysia? Usually a Sdn Bhd with paid-up capital, a MIDA manufacturing licence where the company needs one, and early planning for used machine duty, premises and TNB power.
- How do Korean enterprises find industrial factory buildings in Malaysia? Through rental listings for Port Klang, Shah Alam, Selangor and KL that show each building's power and ceiling specifications.
- How do Chinese enterprises register a manufacturing company in Malaysia? First incorporate a Sdn Bhd with paid-up capital, then apply for a MIDA licence.
- What tax incentives are available for foreign enterprises setting up factories in Malaysia? Qualifying foreign firms can apply for MIDA's manufacturing incentives: the NIF special tax rate or ITA, reinvestment and automation allowances, and green GITA.
- What investment incentives can MIDA provide? For qualifying manufacturers, MIDA offers the NIF special tax rate or ITA, reinvestment and automation allowances, and green GITA.
- What is the cost for Chinese enterprises to set up a factory in Malaysia? The costs cover rent deposits or the purchase price, fit-out, TNB power upgrades starting from RM4,050, Bomba fees, approvals and running costs.
- How do foreign enterprises apply for foreign worker quotas? The quota application is part of the factory's hiring process and sits alongside the Employment Pass rules, the RM1,850 levy and the housing requirements.
- Can Malaysian factories hire Chinese technical personnel? Yes. Chinese technicians may work on a PVP, subject to the Employment Pass rules and the foreign worker quota requirements.
- How do foreign companies apply for a work permit in Malaysia? Through the Employment Pass rules, and for factory staff the company may also apply for a foreign worker quota.
- How can a production line be relocated from China to Malaysia? It means incorporating a Sdn Bhd with paid-up capital, getting a MIDA licence, handling used machine duty and deciding whether to rent or buy the factory.
These questions are answered in full on FactoryHub.
If you are planning a plant in Rawang, Serendah or Shah Alam and want the unit checked against MIDA and council requirements before you sign, WhatsApp Jason Low on +60 12-288 1834.
Questions people ask
01Who issues a manufacturing licence in Malaysia, MIDA or MITI?+
MITI approves the licence under the Industrial Co-ordination Act 1975, and MIDA, an agency under MITI, receives and processes the applications through its InvestMalaysia portal. Applications are online only. For a Selangor project you can also speak to MIDA's state office at Wisma MBSA in Shah Alam.
02What are the exemptions from a manufacturing licence in Malaysia?+
A company with shareholders' funds not exceeding RM2.5 million and no more than 75 full-time paid employees may apply to MIDA for an ICA 10 exemption letter instead of a licence. Milling paddy into rice, milling oil palm fresh fruit into crude palm oil and processing raw natural rubber are exempt whatever the size. The ICA 10 letter is what lets a smaller manufacturer apply for import duty and sales tax exemptions and for investment incentives.
03Do I need a new manufacturing licence if I move my factory?+
You apply to MIDA for a change of factory location rather than a fresh licence, with a justification letter and the original licence, because the Act ties each licence to a place of manufacturing. If you keep the old plant and add a new one, the new place needs its own licence. The council licence, DOSH approval for prescribed plant and the TNB supply must all be arranged again at the new address.
04Does buying a factory give me the seller's manufacturing licence?+
No. The licence belongs to the manufacturer, not the building, and section 7 of the Act bars a transfer to another person without the licensing officer's prior approval. A buyer of the building applies in its own company's name. A buyer of the company keeps the company's licence but applies to MIDA to update the licence conditions for the share transfer and the change of directors.
05Does a MIDA manufacturing licence expire or need renewal?+
MITI's February 2025 townhall deck says the manufacturing licence has no validity period under the current Act, while the council business licence must be renewed. MITI has proposed a licence validation every three years under a new Industrial Development Act, but until that Act is passed and in force the ICA rules apply.
06What happens if I manufacture without a licence when I need one?+
Section 3(2) of the Industrial Co-ordination Act 1975 sets a fine of up to RM2,000 or up to six months in prison, plus up to RM1,000 for every day the default continues. A company that is already producing and has grown past the threshold can apply to MIDA under the regularisation category to bring its operation into line.
07What licences are needed to open a factory in Rawang, Serendah or Shah Alam?+
You need two licences: a MIDA manufacturing licence, approved by MITI, once the company has RM2.5 million or more in shareholders' funds or 75 or more full-time paid employees, and a business premise licence from the local council. The council is MPS for Rawang and Kundang, MPHS for Serendah, Sungai Choh, Bukit Beruntung and Batang Kali, and MBSA for Shah Alam. Depending on the operation, Bomba, DOE and DOSH approvals may also apply, and a manufacturer below both thresholds can apply to MIDA for an ICA 10 exemption letter instead.
08What approvals does a foreign company need to set up a factory in Rawang, Serendah or Shah Alam?+
A foreign company needs a MIDA manufacturing licence under the Industrial Co-ordination Act 1975 once it has RM2.5 million or more in shareholders' funds or 75 or more full-time paid employees, plus a council business premise licence and Bomba, DOE and DOSH approvals. The licence application is made online through MIDA's InvestMalaysia portal, and MITI approves it. The council licence needs a CF or CCC and comes from MPS for Rawang and Kundang, MPHS for Serendah, Sungai Choh, Bukit Beruntung and Batang Kali, or MBSA for Shah Alam.
Sources
- Industrial Co-ordination Act 1975 (Act 156), reprint, Attorney General's Chambers
- MIDA: Guideline on Application for Manufacturing Licence (ML), 6 June 2024
- MIDA: Approval and Licensing (ICA thresholds and definitions)
- MIDA: Guideline on Application for Exemption from Manufacturing Licence (ICA 10), 3 November 2022
- MIDA: Forms and Guidelines, Manufacturing Sector Group A
- MIDA: FAQ (InvestMalaysia portal, ML timelines, ICA 10 documents)
- MIDA: Client Charter
- MIDA: Post Licensing/Incentive Checklist PL (PPG-2017)
- MIDA: Briefing on post incentive and post licensing, 2 August 2019
- MIDA: Contact Us (Selangor state office, Wisma MBSA)
- MIDA: Investment Performance Report 2025 (Industrial Development Bill)
- MITI: Proposed Amendments to Industrial Coordination Act 1975, townhall deck, 14 February 2025
- Azmi & Associates via AmCham Malaysia: Application of a Manufacturing Licence in Malaysia, 19 November 2025
- Majlis Perbandaran Hulu Selangor: Borang komposit permohonan lesen premis perniagaan dan iklan (licence conditions)
- Majlis Perbandaran Selayang: Memohon Lesen / Permit Lesen Sementara (licence conditions)
- The Star: Factory shut for misuse of licence, 19 December 2024
- FactoryHub: Shah Alam registered industrial transactions (JPPH)
Units on the market nearby
Warehouse for Rent in HICOM Glenmarie Industrial, Shah Alam, 85,894 sq ft
RM 210,000/month
Industrial Land for Sale in Eco Ardence, Shah Alam, 2.38 Acres, Freehold
RM 21,771,450
Warehouse for Sale or Rent in Bukit Jelutong, Shah Alam, 143,864 sq ft
RM 88,880,000 · RM 350,000/month
More on licences, bomba and approvals
- Can I Run a Car Workshop in a Factory Unit in Rawang, Serendah or Shah Alam? Zoning, Council Licence, Used Oil Rules and What I Check
- How to Check a Factory's Flood Risk in Shah Alam, Rawang and Serendah: Selangor Flood Map Records, Floor Level, Drains, Rivers and Insurance
- Factory for Metal Fabrication, CNC Machining and Stamping in Rawang, Serendah and Shah Alam: Zoning Class, Power, Crane, Floor Loading and DOE Checks
- Food Factory Requirements in Rawang, Serendah and Shah Alam: Building Specs for MeSTI Certification, GMP, HACCP and Halal, and the Steps From Lease to Production