Short answer

A factory suits an automated line when its power supply can carry the line and ride through voltage dips, the floor is strong and level enough along the routes, the clear height and column grid fit the layout, there is room for compressors and cooling, and the plant that needs DOSH certificates is identified.

A modern detached factory with its roller shutter open onto an empty production hall with a smooth concrete floor, and a fenced electrical substation beside it.
Illustrative image

Key Takeaways

  • An automated line fails on the building before it fails on the machines. I check five things on any factory a client wants to automate: power supply and its quality, the floor, clear height and column spacing, space for services, and the approvals for the plant that comes with the line.
  • TNB expects your equipment to ride through voltage dips. Its supply handbook says all critical equipment and processes must be immune to voltage sag, and that this is the consumer's responsibility.
  • Size the supply first. In TNB's handbook a load above 350 kVA needs a direct cable from a new substation, and from 1,000 kVA the supply moves to 11 kV.
  • Robots and conveyors are not on DOSH's certificate list, but some of what feeds them is. Since June 2024 only steam boilers, pressure vessels and lifting machinery need a certificate of fitness.
  • Automation can earn a 200% capital allowance. MIDA's Automation Capital Allowance covers the first RM10 million spent from 2023 to 2027, for companies operating at least 36 months.

How do I tell whether a factory suits an automated production line?

When a client brings me a line layout, I stop thinking about the price per square foot and start with the building. Automation is less forgiving than manual work: a robot cell does not cope with a voltage dip, an automated guided vehicle does not cope with an uneven floor, and a conveyor cannot route around a column that is in the wrong place. So I go through the same checklist on every unit in Rawang, Serendah or Shah Alam:

  1. Power: how much supply the building has, how much the line needs, and how reliable it is.
  2. Floor: its loading, joints and flatness along the routes machines will travel.
  3. Height and grid: clear height under the trusses and the spacing between columns.
  4. Services: room for compressed air, cooling, extraction and cable trays.
  5. Approvals: the plant that needs DOSH, and any building works that need the council.

The rest of this guide takes each one in turn.

How much power does an automated line need, and when is a substation required?

Start from the maximum demand of the whole line, not the nameplate of one machine, and ask your electrical engineer to add the air compressors, chillers and air conditioning that automation brings with it. Then compare it with what the building has. TNB's Electricity Supply Application Handbook (version 3.1) sets how the supply is given by maximum demand:

Maximum demand How TNB supplies it
Above 100 kVA to 350 kVA 400 V from a feeder pillar or a new or existing substation
Above 350 kVA to 1,000 kVA 400 V by direct underground cable from a new substation
1,000 kVA to below 5,000 kVA 11 kV
5,000 kVA to 25,000 kVA 33 kV

TNB's own web page for contractors quotes slightly different low-voltage bands (415 V up to 72 kVA), so let your engineer confirm the current figures with TNB. If the line pushes the factory past one of these steps, the upgrade can take time and space for a substation; my guides on converting kVA to amps, who pays for a TNB upgrade and compact substations cover those steps.

Why does power quality matter more than power size?

Automated equipment is sensitive to short dips in voltage, and the rules put that risk on you. TNB's handbook says "all critical equipment and processes must be immune to voltage sag", names the IEC 61000-4-11 and 61000-4-34 tests, and states that it is the consumer's responsibility to make voltage-sensitive equipment keep working through unanticipated sags. The consumer declares compatibility on TNB's Power Quality Compliance Declaration Form, and TNB says it does not guarantee that supply will not be interrupted. The Distribution Code of the Energy Commission says the same: short voltage variations may make sensitive equipment misbehave, and a user who needs more protection installs it.

On a viewing I ask the landlord or seller for recent TNB bills and any record of trips, and I ask the client's engineer to budget for ride-through protection (such as UPS or dip compensators on the control circuits) from the start, not after the first unexplained stoppage.

What floor does an automated line need?

Two things: strength and regularity. Strength is the loading in kN/m² and the point loads of machine feet and rack uprights, which my floor loading guide explains with worked examples. Regularity is how flat and level the floor is, and it matters most where vehicles run.

The UK's Concrete Society, whose TR34 report is widely used for industrial floors, separates free movement areas from defined movement areas, where vehicles follow fixed paths such as very narrow aisles between high racking, and says the two need different surface regularity specifications. It also notes that high-lift handling equipment needs tighter control than a low-level factory floor. On an older slab, expect joints, patches and settlement that an AGV or a high-bay truck will not tolerate; a floor survey before signing costs far less than grinding or relaying a floor after.

What clear height and column spacing should I check?

Measure the clear height to the underside of the trusses, lights and sprinklers, not the eave height in the brochure; my guide on clear height and ceiling height shows how. Then lay the line drawing over the column grid. Long lines, conveyors between buildings and robot cells with safety fencing need clear spans, and a column in the wrong place can cost a whole cell. If you plan overhead handling, check the crane beams too, as in my overhead crane guide.

Which approvals come with automation equipment?

The machinery law changed in 2024. The Occupational Safety and Health (Amendment) Act 2022 and the Factories and Machinery (Repeal) Act 2022 came into force on 1 June 2024. Under the 2024 regulations on plant requiring a certificate of fitness, only three kinds of plant need one: steam boilers, pressure vessels and lifting machinery, and each certificate is valid for 15 months from inspection. The same regulations exempt, among others, lifting machinery that forms part of an automatic storage and retrieval system and lifting machinery for material handling equipment, and pressure vessels with a design pressure of 15 psig or less.

In practice: robots and conveyors are not on the list, but a compressed air receiver is a pressure vessel, so ask your supplier whether yours needs a certificate, and an overhead crane needs DOSH design verification before installation. Mezzanines, new openings and machine pits are building works; check with MPS, MPHS or MBSA before you start.

What is a smart factory, and what is an Industry 4.0 factory?

Both terms describe how a factory runs, not a type of building. Industry 4.0 is the shift to production in which machines, sensors and software are connected, so data from the line drives decisions; a smart factory is a plant that works this way, using automation, digitalisation and technologies such as artificial intelligence, the Internet of Things and robotics. Malaysia's policy uses the same language: under the New Industrial Master Plan 2030, MITI set a target of at least 3,000 smart factories by 2030, and the government's Industry4WRD programme starts with a readiness assessment of how far a company has gone.

For the building, a smart factory is the automated line above plus the network behind it: a power supply with headroom and clean quality, floors flat enough for automated vehicles, clear height for automated storage, space and cooling for servers and control rooms, and a reliable business fibre connection. Most older factories in Rawang, Serendah and Shah Alam can be adapted; the checks below show where they usually fall short.

Are there incentives for automating a factory?

Yes. MIDA's Automation Capital Allowance guideline gives a 200% capital allowance on the first RM10 million of qualifying spending incurred in the years of assessment 2023 to 2027, including Industry 4.0 equipment. The company must have been in manufacturing or services for at least 36 months, MIDA and SIRIM evaluate the application, SIRIM verifies the productivity gain, and applications are accepted until 31 December 2027. A company cannot claim it together with Reinvestment Allowance in the same year. MIDA also lists the Industry4WRD intervention fund, a 70:30 matching grant of up to RM500,000 for SMEs that have completed the readiness assessment; check with MIDA that it is open before you plan on it.

How will AI and robotics change factory requirements?

The building questions stay the same, but the answers move. From the sources above, I expect four shifts in what clients ask me for:

  • More power, and cleaner power. Robots, vision systems and the compressors and cooling around them raise maximum demand, and TNB's handbook already puts the duty to ride through voltage dips on the consumer. A unit near a step in TNB's supply bands needs checking early.
  • Flatter floors along fixed routes. Automated vehicles and high-bay storage follow defined paths, which the Concrete Society treats as needing a tighter regularity specification than an ordinary factory floor.
  • Height used for storage, not people. Automatic storage and retrieval systems use height that manual racking does not; DOSH's 2024 regulations exempt lifting machinery that forms part of such a system from the certificate of fitness, so the constraint is the building's clear height and floor, not the paperwork.
  • Fewer operators, more technicians. MIDA's Automation Capital Allowance expects a productivity gain such as fewer man-hours, verified by SIRIM, so plan the canteen, parking and training space for a smaller, more skilled workforce.

A factory built for manual assembly can still take automation, but these four points are where an older unit usually needs work.

What I ask on a viewing for an automated line

  • What is the maximum demand on the TNB bill, and is there a substation on site?
  • Any record of trips or dips, and what protection is installed?
  • Where are the slab joints, and has the floor been patched or cut?
  • What is the clear height under the lowest obstruction, and what is the column grid?
  • Where can the compressor room, chillers and cable trays go?
  • Is there anything on site that holds or needs a DOSH certificate?

If you are planning an automated line in a factory in Rawang, Serendah or Shah Alam and want the building checked against it, WhatsApp Jason Low, Probationary Estate Agent PEA 1478 with CID Realtors, on +60 12-288 1834.

Questions people ask

01How do you determine whether a factory is suitable for an automated production line?+

Check five things against the line layout: power supply and power quality, the floor's loading and flatness along vehicle routes, clear height and column spacing, space for compressors, cooling and cable trays, and the approvals for plant such as air receivers and cranes. A building that fails one of these usually costs more to fix than the price difference between units.

02When does a factory need its own TNB substation?+

In TNB's Electricity Supply Application Handbook, a maximum demand above 350 kVA up to 1,000 kVA is supplied at 400 V by direct cable from a new substation, and from 1,000 kVA the supply moves to 11 kV. Ask your electrical engineer to work out the line's maximum demand and confirm the current figures with TNB.

03Does TNB guarantee power quality for automated equipment?+

No. TNB's handbook says all critical equipment and processes must be immune to voltage sag and that this is the consumer's responsibility, and TNB does not guarantee that supply will not be interrupted. Budget for ride-through protection on control circuits from the start.

04Do robots and conveyors need a DOSH certificate of fitness?+

Not under the 2024 regulations, which list only steam boilers, pressure vessels and lifting machinery, and exempt lifting machinery forming part of an automatic storage and retrieval system. A compressed air receiver is a pressure vessel, so ask your supplier whether yours needs a certificate, and an overhead crane needs DOSH design verification before installation.

05What floor flatness does an AGV or narrow-aisle system need?+

The Concrete Society's guidance separates free movement areas from defined movement areas, where vehicles follow fixed paths, and says they need different surface regularity specifications. High-lift handling equipment needs tighter control than a normal factory floor, so have the floor surveyed along the planned routes before you sign.

06Is there a tax incentive for automating a factory in Malaysia?+

Yes. MIDA's Automation Capital Allowance gives 200% on the first RM10 million of qualifying spending in the years of assessment 2023 to 2027, for companies in manufacturing or services for at least 36 months, with applications accepted until 31 December 2027. It cannot be claimed together with Reinvestment Allowance in the same year.

Sources

  1. TNB: Electricity Supply Application Handbook, version 3.1
  2. TNB: supply information for developers and electrical contractors
  3. Suruhanjaya Tenaga: Distribution Code for Peninsular Malaysia, Sabah and Labuan
  4. The Concrete Society: surface regularity, free and defined movement (2025)
  5. The Concrete Society: floor surface regularity
  6. Malay Mail: amended OSH Act in force from 1 June 2024
  7. DOSH: Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, P.U.(A) 99/2024
  8. DOSH: design verification of lifting machinery
  9. MIDA: guideline for Automation Capital Allowance (2024)
  10. MIDA: Industry4WRD initiatives
  11. MIDA news (20 February 2025): Malaysia sets minimum target of 3,000 smart factories by 2030, MITI

Units on the market nearby

More on power, height, floor and access

All guides: Power, height, floor and access →

Probationary Estate Agent · PEA 1478 · CID Realtors Sdn Bhd E(1) 1855About Jason → · Contact →
Ask Jason about this